Hartnett's Cross Coolcour Macroom Co. Cork, P12XA50
Planning application 23/6176
DecisionConditional permission
Decided08 December 2023
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Hartnett's Cross Coolcour Macroom Co. Cork, P12XA50?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 16/7229Construction of 2 number commercial units consisting of: meat storage/processing building incorporating stores, freezer room, cutting room, loading area, demo room, W.C’s, administration and offices, car-parking together with all ancillary site works. / 0.1 km away / 11 May 2017Granted
- 21/5084The relocation of 100 staff car parking spaces in 2 new car-parking zones (Zone A = 54 spaces and Zone B = 46 spaces) and all other ancillary and associated site development works. / 0.1 km away / 15 July 2021Granted
- 20/4519Elevational alterations, demolitions, internal alterations and renovations to an existing industrial building, to provide new ground floor production office areas, enlarged assembly hall and the provision of a new first floor office and meeting room spaces and associated facilities, all within the existing building fabric; a new covered assembly hall link extension to an existing established ramped link, new loading area with dock leveller platform and new roller door; demolition works to consist of the removal of a roof level plant room, lean-to storage sheds, external dust house, cold stores and external storage compound; alterations to existing hardstand areas, including the provision of ancillary satellite car-parking zone, to provide 40 regular spaces, 4 no. disabled spaces, and 8 no. electric car charging points, the provision of 1 no. bicycle shelter, and all other ancillary and associated site development works. / 0.1 km away / 30 June 2020Granted
- 23/4500The development will consist of the proposed warehouse distribution unit incorporating office accommodation, 2 no. new site entrance access points all off exiting internal estates road, site levelling and contouring, 1 no. security kiosk, associated site signage (1 no. 1.8m high totem sign and 3 no. curved entrance signs), 1 no. waste compactor, truck loading, hard standing and truck parking bay areas, 52 no. parking spaces (to include 47 no. regular spaces, 2 no. disabled spaces and 3 no. electric charging point spaces), 1 no. bicycle shelter, and all other ancillary and associated site development works including landscaping. / 0.2 km away / 11 November 2023Granted
- 09/6305Erection of signage to front elevation of existing industrial building / 0.2 km away / 03 September 2009Granted
- 22/5456Permission for the installation of rooftop photovoltaic solar panel arrays consisting of approximately 1,000 square metres of solar panels on the eastern roof slopes, and approximately 1,000 square metres of solar panels on the western roof slopes of the existing manufacturing building, and all ancillary services and associated site works. / 0.2 km away / 11 August 2022Granted
- 19/4963Construction of an extension to the existing timber frame building manufacturing facility, for the purpose of timber frame building manufacturing and storage / 0.2 km away / 07 June 2019Granted
- 24/4046Permission for the construction of an extension of area approx. 5,122 sq.metres to the existing manufacturing building, and the construction of a canopy of area approx. 1,188 sq.metres over vehicle parking area at east side of proposed extension, and vehicular parking, and all ancillary services and associated site works to the existing timber frame building manufacturing facility. / 0.2 km away / 06 March 2024Granted