Little Island Industrial Estate Ballytrasna Little Island Co.Cork
Planning application 24/5268
DecisionConditional permission
Decided03 April 2025
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Little Island Industrial Estate Ballytrasna Little Island Co.Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 07/4354Alterations to front elevation of existing workshop to include new main entrance to office area and construction of additional office space within existing building / 0.1 km away / 16 March 2007Granted
- 05/7103Construction of single storey self contained warehouse with loading docks for storage of finished concentrate for soft drinks, attached two storey unit with switch room and fork truck maintenance areas on ground floor and offices on first floor, covered link to existing warehouse on adjoining site, security hut, installation of fire water retention pond, removal of existing pond, installation of attenuation tank, entrance and ancillary site works / 0.1 km away / 25 January 2006Granted
- 20/5286Retention of warehouse extension to the rear of existing warehouse premises unit 8A, and elevational changes to the front and rear of existing warehouse premises unit 8. / 0.1 km away / 04 November 2020Granted
- 08/4932Retention of additional section of first floor mezzanine and retention of subdivision of extension permitted under Pl. Reg. No. 97/2722 and retention of extension to same for use as light industrial unit and manufacturing of stainless steel venting systems and ancillary office use / 0.1 km away / 16 April 2008Granted
- 07/12890Construction of 2 no. light industrial building units comprising of Block 1 sub-divided into 2 no. units with ancillary offices and dock levellers and Block 2 subdivided into 6 no. units with ancillary offices and dock levellers, new site entrances, access road, car parking and associated site works and services / 0.1 km away / 27 May 2008Granted
- 10/8147Installation of 3 no. bunded tanks within the existing warehouse building relating to the storage and bulking up of raw and used cooking oil, installation of roller shutter door to the rear elevation of existing building, construction of open canopy area for the temporary storage of raw and used cooking oil containers at the rear of the property and ancillary services / 0.1 km away / 30 November 2010Granted
- 12/5387The development comprises a modified and reduced scale design to that previously permitted under Pl. Reg. No. 11/6227 and Pl. Reg. No. 12/4450, all now to comprise as follows: the construction of a specialised confectionary powder blending facility comprising of a two storey processing factory unit (including ESB substation) and an ancillary office and administration element all located within one block (total 3,740 sq.m.); truck loading bay; associated plant and storage facilities; single storey pump house (total 77sq.m); water storage tank; generator and oil tank compound; waste buffer tank; associated signage; AGI gas metering station; 85 No. parking spaces; vehicular access to site via existing access to former Swissco site and HGV access via existing access to existing PepsiCo ‘Lee Building’ site; visitor set-down area; associated site development and landscaping works; all on a site of 2.263 hectares. / 0.1 km away / 17 August 2012Granted
- 11/6227The development will consist of: construction of a specialised confectionary powder blending facility comprising of a two storey processing factory unit (including ESB substation) and an ancillary 3-storey office and administration element all located within one block (total 4,208 sq.m.); truck loading bay: associated plant and storage facilities; single storey pump house (total 77sq.m.) water storage tank; generator and oil tank compound; waste buffer tank; associated signage; AGI gas-metering station; 85 no. parking spaces; vehicular access to site via existing access to former Swissco site and HGV access via existing access to existing PepsiCo ‘Lee Building’ site; visitor set-down area; associated site development and landscaping works all on a site of 2.263 hectares / 0.1 km away / 12 December 2011Granted