'E-Park' the former Mitsui Denman Site Wallingstown Little Island Co.Cork
Planning application 24/6319
DecisionConditional permission
Decided28 April 2025
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near 'E-Park' the former Mitsui Denman Site Wallingstown Little Island Co.Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 08/6462Construction,demolition and excavation (non-hazardous) waste recovery facility to produce secondary engineering fill materials, 2 no.portacabins for office,canteen & amenity facilities,weighbridge,inspection area,lighting & CCTV equipment,2no.bunded fuel tanks,ducting & services, piping and all associated in ground tanks,silt boxes,oil interceptor,manholes,chambers & groundworks,processing & stockpiling area,including mobile machinery for periodic crushing,screening & magnetic seperation,wheelwash, quarantine area,new site entrance, double gates & notice board at site entrance, 8 no.car parking spaces,site levelling & landscaping, connection to services, fencing & all other associated site works / 0.0 km away / 10 October 2008Granted
- 24/4158Permission for alterations to existing industrial building namely, 1) new architectural cladding to south (front) & west (side) elevations, 2) 2 no. roller shutter doors to south (front) elevation, 3) internal alterations, 4) construction of canopy to east (side) elevation, 5) erect 2 no. signs to south (front) & west (side) elevations, 6) construction of delivery yard to south (front), 7) demolition of ancillary lean-to & standalone buildings to north (rear) & permission for alterations to ancillary existing single storey office namely, a) alterations to elevations, b) 2 no. bay window extensions, c) internal alterations, d) construction of entrance canopy to south & all associated site works / 0.2 km away / 25 March 2024Granted
- 24/5692Permission for extension to North/rear of existing industrial building and all associated site works. / 0.2 km away / 23 December 2024Granted
- 23/4506The construction of a single-storey 10/20kV ESB substation and all associated site development works. / 0.3 km away / 11 May 2023Granted
- 12/5983Construction of a substation and electrical room building and associated ducting and ancillary works. / 0.3 km away / 07 November 2012Granted
- 22/5746Development at the site of the permitted, not yet constructed, 110kV substation on the former Mitsui Denman site consisting of modifications to the 110kV substation permitted by Cork County Council under Pl.Reg.No. 16/5606, as extended under Pl.Reg.No. 21/5225. The proposed modifications will consist of: (1) an increase in the floor area of the permitted two-storey Gas Insulated Switchgear (GIS) 110/20kV substation building (Building A) from c.236.34m2 to c.1,291m2, as well as an increase in height from c.10.4m to c.15m; (b) 1 no. additional single-storey 20 kV switch room and protection building (Building C) (c.151m2); (c) an increase in site area from c.06ha to 0.9249ha: (d) all associated site works including 1 no. additional lighting rod (c.12.5m in height), revisions to 2.4m high palisade security fencing, a new sliding gate, a kiosk on a concrete plinth, and the realignment of the 2 no. 110kV underground cable ducts between the proposed substation and the existing EirGrid 110kV substation to the north. / 0.3 km away / 19 September 2022Granted
- 25/4434A 7-year planning permission is sought by Lidl Ireland GmbH for the construction of a Regional Distribution Centre (RDC) and all ancillary site development works at an approx. 23-hectare site ‘E-Park’ the former Mitsui Denman Site. The proposed development includes: 1) The construction of the main warehouse and distribution building of approx. 59,710 sqm, which includes predominantly warehouse area (54,260sqm) and ancillary spaces including administrative/office spaces, recycling area and plant rooms. The RDC building has an approximate maximum height of 22.25m. 2) The construction of other external ancillary structures including an electrical substation, drivers WC/lounge, gate house, bike/smoking shelter, sprinkler pump house and 2 no. sprinkler tanks (approximate maximum height of the tanks is 11.4m). 3) The provision of vehicular access to the site via a new access road to connect to the southern arm of the existing roundabout on the R623 and will include the realignment of and tying into existing road/paths on the public road, new entrance walls, signage, landscaping, proposed footpaths and cycle lanes, as well as a new 4-arm 40m ICD roundabout. Access from the roadway and roundabout is also provided to serve future developments on adjacent lands outside the scope of this application. This roadway is currently subject to a live planning application (Cork County Council P.A. ref. 24/6319). 4) The establishment of an internal access roadway, designated pedestrian foot/cycle paths and pedestrian crossings, HGV and staff/visitor parking areas, hardstanding building apron including a total of 139 no. dock levellers located along the north-west, south-west and south-east RDC building elevations. 5) All other ancillary site development works to include the undergrounding and rerouting of existing ESB 38kV and 10kV electricity powerlines, the provision of site fencing, a new controlled gated pedestrian access for staff use onto the existing walkway that runs along the southeastern boundary of the site, new gated maintenance entrance along the southern boundary with the existing walkway, the provision of rooftop PV solar panels of c.24,000 sqm in area on the main warehouse building, site and building signage, lighting, site drainage, and all associated hard and soft landscaping including staff amenity space, boundary treatments, planting and landscaping works. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared and will be submitted to the planning authority with the application. / 0.4 km away / 17 December 2025Granted
- 06/9284Construction of storage tank for storage of ammonium sulphate / 0.4 km away / 20 September 2006Granted