Knockgriffin, Midleton, Co. Cork
Planning application 25/6447
DecisionGrant with conditions
Decided27 March 2026
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Knockgriffin, Midleton, Co. Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 24/5421Permission to construct a temporary creche facility on the footprint of house no’s 131 & 132, and to carry out all associated site development works, including the minor alteration of parking layout and modification to footpaths, of development permitted under planning application no. 22/06627. / 0.2 km away / 18 September 2024Granted
- 22/6627A ten-year planning permission for the following Large Scale Residential development comprising the construction of 330 no. residential units (199 no. 3 and 4-bed dwelling houses and 131 no. 2 bed apartment units). 136 no. dwelling houses will have the option to include side ground floor windows. The 131 no. apartments are arranged in 11 no. two-storey buildings, 4 no. three-storey buildings and 1 no. four-storey neighbourhood centre building which includes a creche, retail unit, medical centre, pharmacy and café at ground floor level. All associated ancillary development works including footpaths, pedestrian and cycle lanes, car and bicycle parking, drainage, bin storage, lighting, landscaping and amenity areas. Access to the site will be via a new vehicular access point on to the permitted services link corridor to be delivered under the local infrastructure housing activation fund. A Natura Impact Statement is submitted to the planning authority with this application. The Natura Impact Statement will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the offices of the planning authority. / 0.2 km away / 21 September 2023Granted
- 12/4536Construction of a single storey extension to the side of an existing preschool/playgroup, including ancillary site development works / 0.3 km away / 09 May 2012Granted
- 26/0554Permission for carwash facility comprising of 1) automatic rollover carwash unit complete with side-screens, 2) pressure-jet carwash facility with enclosure building over, 3) 10,000-litre underground water storage tank, 4) carwash pump room for water-treatment facilities, water pumps and compressor unit, at service station complex previously approved under planning files ref. no's 19/5870 and 25/4142 / 0.3 km away / 30 April 2026Granted
- 25/4142A service station development and new access road to the existing industrial complex (Phases 1 & 2 of a 3-phase masterplan development of subject lands). The proposed development includes (1) Phase 1 – provision of new access road to service existing industrial estates and relocation of existing ESB substation; (2) Phase 2 – construction of new two-storey forecourt building with 100sq.m retail shop, 76.51sq.m restaurant food prep area with 5.35sq.m drive-thru facility, 30.28sq.m deli food prep area, 112.26sq.m seating area including 7.32sq.m barista unit, plus offices, stores & toilet facilities at ground and first floor levels; (3) construction of forecourt layout including 4no. fuel pumps and canopy over to service cars and LCV’s, separated 1no. hi-speed fuel pump and canopy over to service HGV’s (with dedicated access lane) and 4 no. underground fuel storage tanks, (4) sale of specially prepared hot & cold food for consumption both on and off the premises from the restaurant/drive thru/deli food areas of forecourt building; (5) ancillary signage for development, both illuminated and non-illuminated; (6) all associated site works including bin compound and (7) boundary adjustments to tie in with council proposed services corridor link road. Phase 3 of the masterplan development will be subject of a separate planning application. Extension of Duration to Permission granted under Planning Ref. No. 19/5870 / 0.3 km away / 28 March 2025Granted
- 19/5870A service station development and new access road to the existing industrial complex (Phases 1 & 2 of a 3-phase masterplan development of subject lands). The proposed development includes (1) Phase 1 – provision of new access road to service existing industrial estates and relocation of existing ESB substation; (2) Phase 2 – construction of new two-storey forecourt building with 100sq.m retail shop, 76.51sq.m restaurant food prep area with 5.35sq.m drive-thru facility, 30.28sq.m deli food prep area, 112.26sq.m seating area including 7.32sq.m barista unit, plus offices, stores & toilet facilities at ground and first floor levels; (3) construction of forecourt layout including 4no. fuel pumps and canopy over to service cars and LCV’s, separated 1no. hi-speed fuel pump and canopy over to service HGV’s (with dedicated access lane) and 4 no. underground fuel storage tanks, (4) sale of specially prepared hot & cold food for consumption both on and off the premises from the restaurant/drive thru/deli food areas of forecourt building; (5) ancillary signage for development, both illuminated and non-illuminated; (6) all associated site works including bin compound and (7) boundary adjustments to tie in with council proposed services corridor link road. Phase 3 of the masterplan development will be subject of a separate planning application. / 0.3 km away / 15 September 2020Granted
- 03/886Construction of ESB substation / 0.3 km away / 28 April 2003Granted
- 25/6929Permission for amendments to part of the development previously permitted under planning reference 21/7265, to consist of the construction of 73 no. residential units to provide changes to unit types and layouts changes from that previously permitted. The proposed development, which will be located in the part of the site commonly known as 'Dawn South' and will provide for a total of 73 no. houses, consisting of; 52no. 3 bed, 2-storey semi-detached houses; 2 no. 5 bed, 3-storey semi-detached houses, 12 no. 3 bed, 2-storey terraced houses; and 7 no. 4 bed, 2-storey detached houses. The proposed development will also provide for 154 no. parking spaces, 90 no. bicycle parking spaces as well as all associated amendments to the previously permitted landscaping and boundary treatments; and all associated site development and infrastructural works necessary to facilitate the proposed development / 0.3 km away / 24 February 2026Granted