Mountinfant, Ballydesmond, Co.Cork
Planning application 26/0629
DecisionGrant with conditions
Decided07 May 2026
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Mountinfant, Ballydesmond, Co.Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 21/5328A single storey slatted unit complete with storage area having a total area of 482m2 complete with ancillary works. The development will require the demolition of existing dilapidated farm buildings with a total area of 315m2. / 0.1 km away / 06 December 2021Granted
- 18/4324The construction of an 8,120sq.m storage yard for the storage of profiles for the manufacture of doors and windows complete with storm water attenuation tank, interceptor, 2.4m high perimeter security fence, landscaping and ancillary services. / 0.1 km away / 03 April 2018Granted
- 15/6503The development of a new single storey PVC processing building with ancillary office, canteen and toilet facilities with a total floor area of 604sq.m together with ancillary services and associated site works / 0.1 km away / 10 February 2016Granted
- 17/4186Retention for works consisting of (i) 34m2 Transformer building (ii) retention of office and canteen now located within the PVC Processing Building (change of design to that permitted under Planning Reg. No. 15/6503 (iii) retaining walls & (iv) access ramp. All works relate to the existing PVC Processing Building. / 0.1 km away / 23 March 2017Granted
- 16/7051The construction of a 1005sq.m single storey Phase 2 extension to the existing PVC Processing building. The extension will comprise of 2 no. units and will require ancillary ground works and services. / 0.2 km away / 28 March 2017Granted
- 18/7396The construction of an open yard (8,234 sq.m) for operations relating to the manufacturing of doors and windows complete with storm water attenuation tank, interceptor, 2.4m high perimeter security fence, landscaping and ancillary services located in both townlands Mountinfant and Lackanastooka. A Natura impact statement will be submitted to the planning authority with this application. / 0.2 km away / 26 September 2019Granted
- 21/6809A phase 3 extension to the existing single-storey processing building, the installation of solar panels on the south-facing roof section of the extension, all ancillary services and associated site works. The total floor area of the works is 484 sq.m. / 0.2 km away / 07 December 2021Granted
- 06/8052Alteration and extension of existing waste water treatment plant with buried discharge pipeline at window and door manufacturing facility / 0.2 km away / 08 August 2006Granted