BALLYSTRANG, NEWMILLS, LETTERKENNY PO
Planning application 1851082
DecisionConditional grant
Decided31 August 2018
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Donegal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Donegal has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near BALLYSTRANG, NEWMILLS, LETTERKENNY PO?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2350050ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK AND DOMESTIC GARAGE INCLUDING ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS / 1.4 km away / 09 March 2023Granted
- 1951521CONSTRUCTION OF WIND FARM, CONSISTING OF 9 WIND TURBINES OF UP TO 85M HUB HEIGHT AND UP TO 100M BLADE DIAMETER WITH A TOTAL HEIGHT NOT EXCEEDING 135M, A PERMANENT METEROLOGICAL LATTICE MAST 85M HIGH, A SUBSTATION AND ASSOCIATED EQUIPMENT, A BORROW PIT, INTERNAL SITE TRACKS, DRAINAGE AND ASSOCIATED WORKS / 1.5 km away / 28 November 2019Granted
- 2650062(1) RETENTION OF ATTIC CONVERSION TO STORAGE AREA, (2) DEMOLITION OF DWELLING AFFECTED BY DEFECTIVE MICA BLOCKS AND (3) ERECTION OF NEW DWELLING AND CONNECTION TO EXISTING SERVICES ON SITE WITH ASSOCIATED SITE WORKS / 1.6 km away / 11 June 2026Granted
- 1751705ERECTION OF DWELLING AND WASTEWATER TREATMENT SYSTEM WITH ASSOCIATED SITE WORKS / 1.8 km away / 11 January 2018Granted
- 2460445ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK AND DOMESTIC GARAGE WITH ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS INCLUDING MAKING USE OF ALREADY CONSTRUCTED BASE PREVIOUSLY GRANTED UNDER REF. 01/6474 / 1.8 km away / 23 May 2024Granted
- 2560143ERECTION OF AN AGRICULTURAL SHED WITH ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS / 1.8 km away / 27 March 2025Granted
- 2461480ELEMENTS OF WIND FARM INFRASTRUCTURE AND RECTIFICATION OF ASSOCIATED RED LINE BOUNDARY / 1.8 km away / 15 May 2025Granted
- 2050835REVISIONS TO THE LAYOUT OF LENELEA WIND FARM (PLANNING REF:09/50116), 200M OF NEW SECTION OF TRACK AND MINOR ROAD IMPROVEMENTS WITHIN THE ADJACENT OPERATIONAL CARK (PLANNING REF: 02/8328), MEENTYCAT (01/8038) AND MEENALABAN (02/8008) WIND FARMS TO FACILITATE DELIVERY OF TURBINE COMPONENTS TO LENALEA. THE DEVELOPMENT WILL CONSIST OF THE FOLLOWING REVISIONS (1) OMMISSION OF PREVIOUSLY PERMITTED PERMANENT MET MAST AND ACCESS TRACK (2) OMMISSION OF PREVIOUSLY PERMITTED TURBINE T1 AND T4 AND ASSOCIATED TRACK (3) OMMISSION OF PREVIOUSLY PERMITTED TEMPORARY CONTRACTORS COMPOUND (4) OMMISSION OF PREVIOUSLY PERMITTED BORROW PIT (5) PROVISION OF PERMANENT MET MAST AND ACCESS TRACK AT A REVISED LOCATION (6) PROVISION OF A NEW MATERIAL STORAGE AREA (7) PROVISION OF TWO NEW EXCAVATED BORROW PITS (8) PROVISION OF A NEW TEMPORARY CONSTRUCTION COMPOUND (9) REVISED SUBSTATION LAYOUT TO MEET EIRGRID SPECIFICATION FOR 110 KV SUBSTATIONS (10) ADJUSTMENT TO ALIGNMENT OF PREVIOUSLY PERMITTED INTERNAL WIND FARM ROADS (11) ALL ASSOCIATED DRAINAGE AND CABLING (12) UPGRADING OF EXISTING ACCESS TRACK FROM OPERATIONAL CARK WIND FARM (PLANNING REF: 02/8328) TO THE PERMITTED SOUTHERN SITE ENTRANCE (13) LOCALISED WIDENING OF THE MAIN ACCESS ROAD THROUGH THE OPERATIONAL CARK (PLANNING REF: 02/8328), MEENTYCAT (01/8038) AND MEENALABAN (02/8008) WIND FARMS TO FACILITATE TURBINE COMPONENT DELIVERY TO LENALEA WIND FARM / 1.8 km away / 20 August 2020Granted