SWILLY ROAD, ARDARAVAN, BUNCRANA
Planning application 1851194
DecisionConditional grant
Decided19 October 2018
Application typeRETENTION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Donegal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Donegal has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near SWILLY ROAD, ARDARAVAN, BUNCRANA?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2050254CONSTRUCTION OF A NEW STOREY AND A HALF DETACHED DWELLING, NEW VEHICULAR ENTRANCE WITH A REALIGNED BOUNDARY WALL AND NEW PARKING AREA FOR THE DEVELOPMENT ACCESSED FROM AILEACH ROAD (AT LOCATION OF EXISTING VEHICULAR ENTRANCE), WHICH WILL BE LINKED TO THE DWELLING BY MEANS OF A NEW RIGHT OF WAY / 0.1 km away / 22 October 2020Granted
- 2051590(A) DEMOLITON OF A SINGLE STOREY LEAN-TO AT THE REAR OF DWELLING (B) CONSTRUCTION OF A TWO-STOREY EXTENSION TO THE REAR OF DWELLING AND ALL ASSOCIATED WORKS / 0.1 km away / 18 December 2020Granted
- 1751864A TEN YEAR DURATION FOR DEVELOPMENT CONSISTING OF THE CONSTRUCTION OF A NEW STORM WATER STORAGE TANK AND ASSOCIATED WORKS / 0.2 km away / 08 February 2018Granted
- 2251853ERECTION OF A DWELLING, CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED WORKS / 0.2 km away / 12 January 2023Granted
- 2051214(1) UPSIZING OF APPROXIMATELY 240M OF 225MM SEWER TO 450MM MINIMUM DIAMETER FROM THE JUNCTION OF CAHIR O'DOHERTY AVENUE AND CRANA ROAD TO OUTSIDE OSBORNE HOUSE ON SHORE ROAD, (2) UPSIZING OF APPROXIMATELY 150M OF 225/300MM SEWER TO 450MM MINIMUM DIAMETER FROM OUTSIDE OSBORNE HOUSE ON SHORE ROAD TO OPPOSITE REAR ENTRANCE TO SCOIL MHUIRE SECONDARY SCHOOL ON GRIANAN PARK, (3) UPSIZING OF APPROXIMATELY 375M OF 300/375MM SEWER TO 525MM MINIMUM DIAMETER FROM OPPOSITE REAR ENTRANCE TO SCOIL MHUIRE SECONDARY SCHOOL ON GRIANAN PARK TO NEAR THE JUNCTION OF AILEACH ROAD AND RAILWAY ROAD (R238), (4) UPSIZING OF APPROXIMATELY 100M OF 375MM SEWER TO 500/525MM MINIMUM DIAMETER FROM NEAR THE JUNCTION OF AILEACH ROAD AND RAILWAY ROAD (R238) TO THE SOUTHERN SIDE OF VICTORIA BRIDGE ON RAILWAY ROAD (R238). THIS SECTION INCLUDES A 500MM DUCTILE IRON PIPE CROSSING OF THE VICTORIA BRIDGE OVER THE MILL RIVER. THIS PIPELINE WILL BE SUSPENDED FROM THE UNDERSIDE OF THE EXISTING BRIDGE STRUCTURE, ADJACENT TO AND PARALLEL TO AN EXISTING PIPELINE, (5) UPSIZING OF APPROXIMATELY 155M OF 375MM SEWER TO 600MM MINIMUM DIAMETER FROM THE SOUTHERN SIDE OF VICTORIA BRIDGE ON RAILWAY ROAD (R238) TO THE WESTERN END OF THE DONEGAL COUNTY COUNCIL STORAGE COMPOUND, (6) UPSIZING OF APPROXIMATELY 15M OF 600MM SEWER TO 750MM MINIMUM DIAMETER FROM THE WESTERN END OF THE DONEGAL COUNTY COUNCIL STORAGE COMPOUND TO THE WWTP INLET, (7) ALL ASSOCIATED SITE DEVELOPMENT WORKS ABOVE AND BELOW GROUND A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION / 0.2 km away / 22 October 2020Granted
- 2350915AN EXTERNAL FAMILY ROOM, CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED WORKS / 0.2 km away / 17 August 2023Granted
- 2150381(1) ENTRY PORCH CONSTRUCTED OVER THE EXISTING ACCESS RAMP (2) 2NO. EXTERNAL SIGNS (C) SERVICE HATCH ALL LOCATED ON THE SOUTH EAST FACING ELEVATION AND PERMISSION FOR (1) REMOVAL OF THE EXISTING CONCRETE RAMP ACCESSING THE BEACH (2) CONSTRUCTION OF A TIERED BALCONY AREA WITH 2.1M HIGH PERIMETER GLAZED WIND BREAKER, RETRACTABLE AWNINGS, ACCESS FROM THE EXISTING BUILDING AND STEPPED ACCESS FROM THE FOOTPATH (3) CONSTRUCTION OF NEW STEPPED AND RAMPED ACCESS TO THE BEACH / 0.2 km away / 19 August 2021Granted
- 2562254(1) DEMOLITION OF EXISTING DWELLING DUE TO DEFECTIVE MICA BLOCKWORK AND (2) ERECTION OF A REPLACEMENT DWELLING WITH CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKS / 0.3 km away / 06 February 2026Granted