KNOCKNASHANGAN, BALLYSHANNON, DONEGAL PO
Planning application 1851318
DecisionRefused
Decided15 October 2018
Application typeOUTLINE PERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Donegal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Donegal has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near KNOCKNASHANGAN, BALLYSHANNON, DONEGAL PO?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 1851053CHANGE OF HOUSE DESIGN FROM THAT GRANTED PREVIOUSLY 08/20585 / 1.9 km away / 23 August 2018Refused
- 2561071(1) ERECTION OF A MACHINERY SHED AND (2) UPGRADE OF EXISTING SEPTIC TANK SYSTEM IN EXISTING BUILDERS YARD / 3.1 km away / 08 August 2025Refused
- 1750150ERECTION OF AN EXTENSION TO SIDE OF EXISTING DWELLING HOUSE, DECOMMISSIONING OF EXISTING SEPTIC TANK SYSTEM AND INSTALLATION OF NEW SECONDARY AND TERTIARY WASTE WATER TREATMENT SYSTEM WITH DISPOSAL FILTER AREA / 3.4 km away / 23 March 2017Refused
- 2460197A TEN-YEAR PERMISSION FOR A GRID SERVICES FACILITY COMPRISING OF (1) AN ENCLOSED BATTERY ENERGY STORAGE SYSTEM COMPOUND CONTAINING BATTERY ENERGY STORAGE CONTAINERS, ELECTRICAL INVERTERS, TRANSFORMERS AND POWER CONTROL CENTRES, (2) AN ENCLOSED SYNCHRONOUS CONDENSER COMPOUND CONTAINING A HORIZONTAL SYNCHRONOUS GENERATOR HOUSED WITHIN A SYNCHRONOUS CONDENSER BUILDING AND ANCILLARY INFRASTRUCTURE INCLUDING A FLYWHEEL, TRANSFORMER, CIRCUIT BREAKER AND COOLING EQUIPMENT, (3) UNDERGROUND ELECTRICAL AND COMMUNICATIONS CABLING, (4) SITE ENTRANCE FROM THE L7965-1 LOCAL ROAD, (5) ON-SITE ACCESS TRACK, (6) SECURITY FENCING AND SECURITY GATES, (7) POLE-MOUNTED SECURITY CAMERAS, (8) ALL ASSOCIATED AND ANCILLARY SITE DEVELOPMENT, LANDSCAPING AND REINSTATEMENT WORKS. THE OPERATIONAL LIFETIME OF THE PROPOSED DEVELOPMENT IS 35 YEARS. THIS PLANNING APPLICATION IS ACCOMPANIED BY AN APPROPRIATE ASSESSMENT SCREENING REPORT / 3.6 km away / 25 November 2024Refused
- 1851741A TEN-YEAR PLANNING PERMISSION FOR A WIND FARM WITH A 30-YEAR OPERATIONAL LIFE (FROM THE DATE OF COMMISSIONING) CONSISTING OF (A) UP TO 7 NO. WIND TURBINES WITH A TIP HEIGHT OF UP TO 150 METRES AND ALL ASSOCIATED FOUNDATIONS AND HARDSTANDING AREAS, (B) 1 NO. ON-SITE ELECTRICAL SUB-STATION, (C) 1 NO. TEMPORARY CONSTRUCTION COMPOUND, (D) 1 NO. ANEMOMETRY MAST WITH A HEIGHT OF UP TO 100 METRES, (E) RECREATIONAL AMENITY TRAIL AND ASSOCIATED SIGNAGE, PARKING AND RECREATIONAL FACILITIES, (F) ALL ASSOCIATED UNDERGROUND ELECTRICAL AND COMMUNICATIONS CABLING CONNECTING THE TURBINES TO THE PROPOSED ON-SITE SUBSTATION, (G) UPGRADING OF EXISTING ACCESS TRACKS AND PROVISION OF ANY NEW SITE ACCESS ROADS REQUIRED INCLUDING NEW SITE ACCESS ONTO THE LOCAL ROAD NETWORK IN THE TOWNLAND OF TULLYHORKY AND ASSOCIATED DRAINAGE, (H) EXCAVATION OF 1 NO. BORROW PIT AND (I) ALL ASSOCIATED SITE DEVELOPMENT WORKS (INCLUDING TREE FEELING). AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) AND A NATURA IMPACT STATEMENT (NIS) HAS BEEN SUBMITTED / 3.7 km away / 18 July 2019Refused
- 1951750ALTERATIONS TO (A) INCREASE IN TIP HEIGHT OF THE FIVE PERMITTED TURBINES, FROM 136 METRES TO UP TO 150 METRES (B) AMENDMENTS TO LOCATIONS OF PERMITTED TURBINES NO.'S 1 AND 3; (C) INCREASE IN SIZE OF PERMITTED HARDSTANDING AREAS; (D) UPGRADING OF EXISTING ACCESS TRACKS AND PROVISION OF NEW SITE ACCESS ROADS; (E) ALL ASSOCIATED UNDERGROUND ELECTRICAL AND COMMUNICATIONS CABLING CONNECTING THE TURBINES TO THE ONSITE SUBSTATION; (F) ALL ASSOCIATED SITE DEVELOPMENT WORKS (INCLUDING TREE FELLING). THE PROPOSED DEVELOPMENT WILL HAVE AN OPERATIONAL LIFE OF 30 YEARS FROM THE DATE OF COMMISSIONING OF THE DEVELOPMENT AND THE APPLICATION SEEKS A TEN YEAR PLANNING PERMISSION. AN ENVIRONMENTAL IMPACT AWARENESS REPORT AND A NATURA IMPACT STATEMENT ACCOMPANY THIS APPLICATION / 3.7 km away / 11 June 2020Refused
- 1750797DEMOLITION OF EXISTING STORES AND WORKSHOP AND ERECTION OF 8 NO. TERRACE TYPE 2 STOREY 3 BED. DWELLINGHOUSES, 8 NO. 2 STOREY SEMI-DETACHED 3 BED. DWELLINGS, 2 NO. SEMI-DETACHED SINGLE STOREY 2 BED. DWELLINGHOUSES AND 3 NO. TERRACE TYPE SINGLE STOREY 2 BED. DWELLINGHOUSES AND ALL ASSOCIATED SITE DEVELOPMENT WORKS / 4.9 km away / 13 July 2017Refused
- 2561180DEMOLITION OF EXISTING ACCOMMODATION UNIT WITH ADJACENT STORAGE AND REPLACEMENT ACCOMMODATION UNIT AND ALL ASSOCIATED SITEWORKS / 4.9 km away / 21 August 2025Refused