BHÓTHAR NA TRÁ, MACHAIRE CHLOCHAIR, AN BUNBEAG
Planning application 2050808
DecisionConditional grant
Decided05 November 2020
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Donegal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Donegal has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near BHÓTHAR NA TRÁ, MACHAIRE CHLOCHAIR, AN BUNBEAG?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2251110CONSTRUCTION OF AN EXTENSION TO THE REAR OF THE EXISTING RESTAURANT FOR A STORE AND AN EXTENDED KITCHEN AREA / 0.1 km away / 18 August 2022Granted
- 1851063CHANGE OF USE FOR PART OF THE EXISTING BUILDING TO A RESTAURANT AND GUEST HOUSE FACILITY, (2) EXTENSION TO EXISTING BUILDING FOR RESTAURANT USE ON GROUND FLOOR (3) 2 NEW FIRE EXITS FROM THE FIRST FLOOR AND (4) CONNECTION TO A NEW SEPTIC TANK AND SAND FILTER AREA WITH THE DECOMMISSIONING OF THE EXISTING TREATMENT SYSTEMS & ASSOCIATED SITE DEVELOPMENT WORKS / 0.1 km away / 24 August 2018Granted
- 2460749CONSTRUCTION OF A DWELLING HOUSE WITH AN ON-SITE SEWAGE TREATMENT SYSTEM / 0.2 km away / 20 February 2025Granted
- 2051883CONSTRUCTION OF A 1.5 STOREY DWELLING HOUSE WITH SINGLE-STOREY ANNEXE, WASTEWATER TREATMENT SYSTEM, PERCOLATION AREA, ENTRANCE AND ANCILLARY SITE WORKS / 0.2 km away / 29 July 2021Granted
- 2051917LE HAGHAIDH TEACH CONAITHE ÚR A THOGÁIL, CHOMH MAITH LE CÓRAS CÓIREÁLA FUÍOLLUISCE LE SCAGAIRE SNASÚCHÁIN AGUS GACH OBAIR CHOIMHDEACH SUÍMH / 0.2 km away / 08 July 2021Granted
- 2460216(1) RETENTION AND COMPLETION OF EXISTING GROUNDWORKS AND (2) ERECTION OF A BOUNDARY WALL ON THE SOUTHERN SIDE OF SITE WITH ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS / 0.3 km away / 20 February 2025Granted
- 2460280(1) ALTERATIONS TO THE ROOF DORMER AND INSTALLATION OF TWO ROOF-LIGHT WINDOWS TO THE FRONT ELEVATION OF THE DWELLING HOUSE, (2) CONSTRUCTION OF A ROOF-DORMER STRUCTURE TO FACILITATE EXTENSION TO THE FIRST FLOOR BEDROOMS TO THE BACK ELEVATION OF THE DWELLING HOUSE, (3) CONSTRUCTION OF RAISED TIMBER DECK AREA AT GROUND FLOOR LEVEL OF THE DWELLING HOUSE TO THE BACK ELEVATION OF THE DWELLING HOUSE, (4) INSTALLATION OF WASTEWATER TREATMENT SYSTEM IN THE BACK GARDEN OF THE DWELLING HOUSE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS / 0.3 km away / 20 June 2024Granted
- 2151800CONSTRUCTION OF 44 NO. NEW HOTEL BEDROOMS AND GYM WITHIN A NEW 3 STOREY BLOCK, THE CHANGE OF USE OF EXISTING STORAGE AREA AT GROUND FLOOR LEVEL IN THE EXISTING 3 STOREY BLOCK TO THE REAR OF THE SITE TO PROVIDE OF 8 NO. ADDITIONAL BEDROOMS AT GROUND FLOOR LEVEL (52 NO. NEW BEDROOMS OVERALL), THE EXISTING 28 NO. HOTEL BEDROOMS ARE TO BE RENOVATED CREATING A TOTAL OF 80 NO. BEDROOMS. IT IS PROPOSED TO PROVIDE 2 NO. 2 STOREY EXTENSIONS TO THE FRONT OF THE STREET FACADE (WEST ELEVATION FRONTING THE R257) OF THE EXISTING HOTEL BAR AND RESTAURANT TO PROVIDE A CAFE AND ADDITIONAL RESTAURANT AREA AT GROUND FLOOR LEVEL AND THE CONSTRUCTION OF 2 NO. FIRST FLOOR APARTMENTS. IT IS ALSO PROPOSED TO CARRY OUT INTERNAL ALTERATIONS TO THE RESTAURANT, RECEPTION AREA, NEW TOILETS AND PLANT ROOMS AND DEMOLITION OF PART OF THE BUILDING TO REMOVE THE EXISTING NIGHTCLUB AND TOILET BLOCK TO FACILITATE THE NEW HOTEL ROOMS AND GYM. ANCILLARY CAR PARKING (94 CAR SPACES) AND COACH SET DOWN FOR PATRONS OF THE HOTEL, AND ALL ASSOCIATED SITE DEVELOPMENT AND ENGINEERING WORKS INCLUDING A NEW WASTEWATER TREATMENT PLANT NECESSARY TO FACILITATE THE DEVELOPMENT. / 0.3 km away / 29 August 2022Granted