OWEY ISLAND, KINCASLAGH, CO. DONEGAL
Planning application 2150412
DecisionConditional grant
Decided24 June 2021
Application typeRETENTION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Donegal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Donegal has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near OWEY ISLAND, KINCASLAGH, CO. DONEGAL?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2561785INSTALLATION OF AN ELECTRONIC COMMUNICATIONS STRUCTURE COMPRISING OF A 6-METRE-HIGH TIMBER POLE SUPPORTING 1 NO. RADIO-LINK DISH, TOGETHER WITH SINGLE BAY CABINET, FIBRE CHAMBER, FOUNDATION, CONCRETE PLINTH AND ALL ASSOCIATED ANCILLARY DEVELOPMENT WORKS. THE DEVELOPMENT IS REQUIRED TO CARRY THE BROADBAND DATA FROM THE NEW HIGH SPEED FIBRE BROADBAND NETWORK ON THE ISLAND TO THE MAINLAND BY RADIO LINK, TO CONNECT TO THE NBI NATIONAL FIBRE NETWORK, AS PART OF THE GOVERNMENT’S NATIONAL BROADBAND PLAN TO PROVIDE HIGH SPEED BROADBAND TO ALL PARTS OF THE COUNTRY THAT ARE NOT AVAILABLE COMMERCIALLY, INCLUDING THE ISLANDS, AT THE SAME DATA SPEED / 1.0 km away / 15 January 2026Granted
- 2350771(1) ALTERATIONS TO THE EXISTING DWELLING FACADE TO INCLUDE RECONFIGURATION OF WINDOW OPES AND THE ADDITION OF STONE CLADDING, (2) ALTERATIONS TO THE EXISTING DOMESTIC GARAGE, THE WORKS CONSIST OF THE ADDITION OF A DORMER WINDOW EXTENSION AND THE CONVERSION OF THE ATTIC SPACE FOR USE AS A GYM. ALTERATIONS TO THE FACADE TO INCLUDE PROPOSED STONE CLADDING AND NEW WINDOW OPES AND (3) DEMOLTION OF AN EXISTING SHED AND THE REPLACEMENT WITH A PROPOSED GARDEN ROOM STRUCTURE AND ALL ANCILLARY WORKS / 1.6 km away / 20 July 2023Granted
- 2550143REPLACEMENT OF EXISTING DECKING AREA WITH POD LIKE STRUCTURE FOR PRIVATE USE ASSOCIATED WITH EXISTING DWELLING HOUSE / 1.6 km away / 05 December 2025Granted
- 1750675(A) THE DECOMMISSIONING OF AN EXISTING SEPTIC TANK AND PERCOLATION AREA SERVING EXISTING DWELLING (B) INSTALLATION OF A NEW SEWAGE TREATMENT SYSTEM WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS TO SERVE EXISTING DWELLING / 2.2 km away / 26 June 2017Granted
- 2560708(1) DEMOLITION OF EXISTING DWELLING HOUSE AND CONSTRUCTION OF A REPLACEMENT DWELLING WITH ATTACHED DOMESTIC GARAGE AND (2) DECOMMISSIONING OF EXISTING SEPTIC TANK AND INSTALLATION OF NEW WASTEWATER TREATMENT PLANT WITH INTERMITTENT MONO-GRADE TERTIARY SAND FILTER AND ALL ASSOCIATED SITE WORKS / 2.3 km away / 26 February 2026Granted
- 2252101ENLARGEMENT OF 1 NO. WINDOW OPENING ON THE WEST ELEVATION WITH PROPOSED FRAME TO MATCH THAT OF THE EXISTING FRAMES / 2.4 km away / 23 February 2023Granted
- 2051880(1) ERECTION OF A SMALL (5M2) LEAN-TO STORAGE SHED/BOILER HOUSE TO THE SIDE (SOUTH) ELEVATION OF THE EXISTING PROPERTY (2) REPLACEMENT OF ALL EXISTING WINDOWS AND EXTERNAL DOORS AND THE ENLARGEMENT OF 1 NO. WINDOW TO THE REAR (EAST) ELEVATION OF THE PROPERTY (3) INTERNAL REFURBISHMENT WORKS THROUGHOUT / 2.4 km away / 04 February 2021Granted
- 2460595(1) CONSTRUCTION OF AN EXTENSION TO THE WESTERN SIDE GABLE OF EXISTING DWELLING, (2) INSTALLATION OF 2 NO. GABLE WINDOWS TO THE ATTIC STORAGE SPACE AND ASSOCIATED SITE DEVELOPMENT WORKS / 2.5 km away / 20 June 2024Granted