HIGH ROAD, LETTERKENNY, LETTERKENNY PO
Planning application 2250397
DecisionConditional grant
Decided01 September 2022
Application typeRETENTION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Donegal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Donegal has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near HIGH ROAD, LETTERKENNY, LETTERKENNY PO?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2352013(1) CHANGE OF USE OF FIRST FLOOR ENTERTAINMENT / FUNCTION ROOM TO GUEST ACCOMMODATION ANCILLARY TO EXISTING PREMISES AND ALL ASSOCIATED INTERNAL AND EXTERNAL WORKS RELATING TO SAME, (2) CONSTRUCTION OF REAR EXTENSION TO THE SECOND FLOOR OFFICE ON THE NORTHERN AND EASTERN ELEVATION, AND (3) ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS / 0.0 km away / 15 February 2024Granted
- 2560826CHANGE OF USE OF EXISTING BUILDING FROM OFFICE BACK TO RESIDENTIAL DWELLING AND CONSTRUCTION OF A 2-STOREY EXTENSION COMPRISING 3 BEDROOMS AND 1 BATHROOM, TO THE REAR OF THE PROPERTY, CONNECTION TO EXISTING SERVICES AND ANCILLARY SITE WORKS / 0.1 km away / 03 July 2025Granted
- 2660784ERECTION OF A NEW FABRIC DOME OVER EXISTING TENNIS COURT, INCLUDING LIGHTWEIGHT STEEL SUBSTRUCTURE COVERED WITH SINGLE MEMBRANE PVC FABRIC, AND ALL ANCILLARY SITE WORKS / 0.1 km away / 18 June 2026Granted
- 1750166CONSTRUCTION OF 1 NO. FULL SIZE AND 2 NO. MINI TENNIS COURTS, A 2.75M HIGH REINFORCED CONCRETE RETAINING WALL, 8 NO. 8.0M HIGH FLOODLIGHTS AND A 2.75M HIGH BOUNDARY FENCE, INCLUDING ALL ASSOCIATED SITE WORKS / 0.1 km away / 23 March 2017Granted
- 2251511CONSTRUCTION OF A 2 STOREY EXTENSION TO EXISTING BUILDING TO PROVIDE ADDITIONAL FOOD PREPARATION AREA ON GROUND FLOOR AND ADMINSTRATION / OFFICE SPACE ON FIRST FLOOR AREA ASSOCIATED WITH EXISTING BUSINESS AND ALL ASSOCIATED SITE WORKS INCLUDING CONNECTION TO PUBLIC SERVICES / 0.1 km away / 27 October 2022Granted
- 2461761(1) CONSTRUCTION OF (A) A NEW BUILDING TO PROVIDE 32 NO. STUDENT APARTMENTS AND (B) ANCILLARY AND ASSOCIATED ACCOMMODATION TO THE STUDENT APARTMENTS INCLUDING A DAY ROOM, SERVERY, LAUNDRY ROOM, I.T. ROOM AND PLANT ROOM, (2) PROVISION OF (A) A NEW FOUL SEWER CONNECTION TO THE EXISTING PUBLIC SEWER, (B) A NEW STORM WATER CONNECTION TO THE EXISTING PUBLIC SEWER, (C) A NEW WATER CONNECTION FROM THE EXISTING PUBLIC WATER MAIN, (D) A DISABLED ON-SITE PARKING SPACE AND (E) BICYCLE PARKING AND BIN STORAGE AND (3) ALL ASSOCIATED SITE DEVELOPMENT WORKS / 0.2 km away / 29 May 2025Granted
- 2350700CHANGE OF USE OF FORMER FIRST FLOOR OFFICES OF DONEGAL NEWS TO A COMMUNITY CENTRE / 0.2 km away / 07 July 2023Granted
- 2560772(1) DEMOLITION OF EXISTING HOUSE AND SHEDS, (2) CONSTRUCTION OF THE FOLLOWING: BLOCK A - 4 STOREY STUDENT ACCOMMODATION UNIT CONTAINING 30 BEDROOMS, LIVING ACCOMMODATION AND A ROOF TERRACE AMENITY SPACE, BLOCK B - 3 STOREY APARTMENT BLOCK CONTAINING 6 NO. 2-BED APARTMENTS & BLOCK C -3 STOREY APARTMENT BLOCK CONTAINING 6 NO. 2-BED APARTMENTS AND 3 NO. 1-BED APARTMENTS, (TOTAL NO. OF APARTMENTS - 15), (3) NEW ACCESS ENTRANCE TO THE NORTH WEST BOUNDARY OF THE SITE WITH A PROPOSED ONE-WAY TRAFFIC SYSTEM, (4) ANCILLARY ACCOMMODATION TO INCLUDE CARPARKING, BICYCLE PARKING, SHARED BIN STORAGE COMPOUNDS AND LANDSCAPED AMENITY AREAS, (5) ALL ASSOCIATED SITE WORKS INCLUDING RETAINING WALLS, STORM ATTENUATION AND CONNECTION TO EXISTING STORM AND FOUL DRAINAGE NETWORK / 0.2 km away / 26 February 2026Granted