RAILWAY ROAD, STRANORLAR, LIFFORD PO
Planning application 2250661
DecisionUnconditional grant
Decided02 June 2022
Application typeEXTENSION OF DURATION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Donegal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Donegal has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near RAILWAY ROAD, STRANORLAR, LIFFORD PO?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 1750788ERECTION OF CIRCA 6600 CAPACITY SEATED STADIUM COMPRISING 4 STANDS & INCORPORATING CHANGING FACILITIES, OFFICE SPACE, CLUB GYM, TV GANTRY, STORAGE SPACE, TOILETS & 3 STOREY ADMIN. BUILDING (INCLUDING OFFICES, MEETING ROOMS AND CLUB ROOM) TOGETHER WITH ANCILLARY FACILITIES INCLUDING FLOOD LIGHTS, TURNSTILE & PARKING WITH ASSOCIATED SITE WORKS AND DRAINAGE / 0.0 km away / 27 July 2017Granted
- 2462022COMPLETION OF THE PARTIALLY CONSTRUCTED FOOTBALL STADIUM (APPROXIMATELY 5580 TOTAL SPECTATOR CAPACITY), PREVIOUSLY APPROVED UNDER THE NOW-LAPSED PLANNING PERMISSION REF. NO. 05/9008. THE COMPLETED STADIUM WILL CONSIST OF 4 NO. STANDS IN A CLOSED-BOWL CONFIGURATION (WITH THE WEST STAND ALREADY PARTIALLY CONSTRUCTED) AND WILL INCLUDE THE FOLLOWING: (1) WEST STAND WHICH WILL CONSIST OF THE EXISTING PRECAST CONCRETE TERRACE, PROVIDING SEATING FOR APPROXIMATELY 2,100 SPECTATORS, ALONG WITH AN ANCILLARY ACCOMMODATION BUILDING WHICH WILL INCLUDE CHANGING FACILITIES, PUBLIC AND STAFF TOILETS, A GYMNASIUM, TREATMENT ROOMS, OFFICES, STORAGE, AND PLANT AT GROUND FLOOR LEVEL (PARTIALLY UNDER THE RAKED TERRACES) WITH MULTIPURPOSE ROOMS, LICENSED CORPORATE BOXES SUITES, MEETING SPACES, TRAINING ROOMS, CLUB ROOMS, A CONTROL ROOM, MEDIA ROOMS, AND OFFICES AT FIRST AND SECOND FLOOR LEVELS ABOVE. THIS WILL INVOLVE THE RENOVATION AND PART DEMOLITION OF THE EXISTING PARTIALLY COMPLETED ANCILLARY ACCOMMODATION BLOCK, (2) EAST STAND FEATURING A NEWLY CONSTRUCTED SPECTATOR TERRACE WITH SEATING FOR APPROXIMATELY 1,230 SPECTATORS, ALONG WITH A NEW AMENITY BUILDING WHICH WILL HOUSE A GYMNASIUM, TREATMENT ROOM, TOILETS, CHANGING FACILITIES, AND AN OFFICE AT GROUND FLOOR LEVEL WITH THE PROVISION OF A HOSPITALITY AREA TO FIRST FLOOR LEVEL AND A TV GANTRY LOCATED AT ROOF LEVEL AS WELL AS 2 NO. DETACHED, EXTERNALLY ACCESSED PUBLIC TOILET BLOCKS, (3) NORTH AND SOUTH STANDS WHICH WILL INCLUDE NEWLY CONSTRUCTED SPECTATOR TERRACES, EACH WITH SEATING FOR APPROXIMATELY 240 SPECTATORS AND ADDITIONAL STANDING CAPACITY FOR CIRCA 885 SPECTATORS EACH, (4) COMPLETION OF THE GRASS PLAYING PITCH FORMATION WITH STORM DRAINAGE AND GOALS, FLAGS, LINING FENCING RAILS AND NORMAL SOCCER ACCESSORIES AND (5) SITE DEVELOPMENT WORKS WHICH WILL INCLUDE THE PROVISION OF CAR PARKING, BUS PARKING, SEGREGATED PEDESTRIAN ROUTES, TURNSTILES, 4 NO. 1200 LUX FLOODLIGHTS (APPROXIMATELY 40 METERS TALL), AN ESB SUBSTATION, AND ASSOCIATED SITE WORKS, INCLUDING COMPLETION OF DRAINAGE, BOTH HARD AND SOFT LANDSCAPING, GATES, ACCESS CONTROL AND SITE BOUNDARY FENCING / 0.0 km away / 19 December 2025Granted
- 2460336CONSTRUCTION OF A DRY BEDDED SHED FOR LIVESTOCK AND ASSOCIATED SITE DEVELOPMENT WORKS / 0.1 km away / 25 April 2024Granted
- 1750657DEVELOPMENT AT THE BALLYBOFEY / STRANOLAR WASTEWATER TREATMENT PLANT CONSISTING OF103M2 EXTENSION TO THE EXISTING SLUDGE PRESS BUILDING, NEW 94M2 DEWATERED SLUDGE BUILDING AND ALL ASSOCIATED SITE WORKS. PREVIOUS PLANNING REF NO. 16/51121 REFERS. THE APPLICATION RELATES TO A DEVELOPMENT WHICH REQUIRES AN EPA WASTEWATER DISCHARGE LICENCE (WWDL), CURRENT LICENCE NUMBER D0120-01 / 0.2 km away / 23 June 2017Granted
- 2050038CONSTRUCTION OF AN EXTENSION TO EXISTING CRECHE TO PROVIDE AN ADDITIONAL FIRE ESCAPE STAIRWAY AND ALL OTHER ASSOCIATED SITE WORKS / 0.2 km away / 05 March 2020Granted
- 2461207(1) CHANGE THE USE OF A STORAGE BUILDING INTO AN AFTERSCHOOL ROOM, (2) EXTENSION OF THE CURRENT STORAGE BUILDING, TO INCLUDE AN ADDITION OF A LAUNDRY AREA AND A STORAGE CONTAINER, AND ALL RELATED SITE WORKS / 0.2 km away / 26 September 2024Granted
- 1850302A STORAGE BUILDING FOR SPORTS AND ATHLETICS EQUIPMENT AND PERMISSION FOR CONSTRUCTION OF AN EXTENSION TO THE REAR (WESTERN) SIDE OF EXISTING BUILDING. THE PROPOSED EXTENSION SHALL PROVIDE 4 NO. CHANGING ROOMS, 2 NO. OFFICALS CHANGING, A SPORTS EXHIBITION AREA, TOILET FACILITIES AND ASSOCIATED SITE DEVELOPMENT WORKS / 0.2 km away / 26 April 2018Granted
- 2251228INSTALLATION OF 1,106 SQUARE METERS OF SOLAR PV (PHOTO VOLTAIC) PANELS ONTO THE ROOF AREAS OF BOTH FINN VALLEY ATHLETIC CENTRE AND FINN VALLEY LEISURE CENTRE AND ASSOCIATED SITE DEVELOPMENT WORKS / 0.3 km away / 07 September 2022Granted