UMUSKAN, KILCAR, DONEGAL PO
Planning application 2350167
DecisionRefused
Decided30 March 2023
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Donegal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Donegal has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near UMUSKAN, KILCAR, DONEGAL PO?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2561709RESIDENTIAL UNIT AND ALL ASSOCIATED SITE WORKS / 1.7 km away / 13 November 2025Refused
- 2560900CONSTRUCTION OF A NEW DWELLING HOUSE WITH CONNECTION TO THE EXISTING ON SITE SEWAGE TREATMENT SYSTEM AND PERCOLATION AREA AND ASSOCIATED SITE WORKS / 1.7 km away / 18 July 2025Refused
- 215126340 YEAR PERMISSION FOR AN ADDITIONAL 1 NO. WIND TURBINE, TO THE EXISTING 3 NO. TURBINE WINDFARM CONSISTING OF CONSTRUCTION OF: (1) 1 NO. WIND TURBINE WITH A HUB HEIGHT OF UP TO 84 METRES AND AN OVERALL HEIGHT OF UP TO 125 METRES TO BLADE TIP, (2) 1 NO.CRANE HARDSTAND AREA LOCATED BESIDE THE TURBINE, (3) 1 NO. 20 kV SUBSTATION BUILDING WITH ASSOCIATED ELECTRICAL PLANT AND EQUIPMENT, (4) INTERNAL WIND FARM UNDERGROUND CABLING, (5) NEW SITE ACCESS TRACK, (6) INSTALLATION OF A DRAINAGE SYSTEM FOR THE PROPOSED HARD STAND AND ACCESS TRACK AREAS, (7) UNDERGROUND GRID CONNECTION OF APPROXIMATELY 910 METRES IN LENGTH, PREDOMINANTLY ALONG THE EXISTING WIND FARM ACCESS ROAD NETWORK AND ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS IN THE TOWNLANDS / 1.8 km away / 12 August 2021Refused
- 2050291FOR A PERIOD OF TEN YEARS FOR THE ADDITION OF TWO WIND TURBINES TO THE EXISTING THREE TURBINE WINDFARM. THE DEVELOPMENT WILL CONSIST OF THE FOLLOWING: CONSTRUCTION OF (1) TWO WIND TURBINES WITH HUB HEIGHTS OF UP TO 55 METRES AND AN OVERALL HEIGHT OF UP TO 77 METRES TO BLADE TIP; (2) TWO CRANE HARDSTAND AREAS LOCATED BESIDE EACH TURBINE; (3) ONE 20 KV SUBSTATION BUILDING WITH ASSOCIATED ELECTRICAL PLANT AND EQUIPMENT (4) INTERNAL WINDFARM UNDERGROUND CABLING AND NEW SITE ACCESS TRACK AND INSTALLATION OF (1) A DRAINAGE SYSTEM FOR THE PROPOSED HARDSTANDS AND ROAD ACCESS (2) UNDERGROUND GRID CONNECTION OF APPROXIMATELY 910M IN LENGTH, PREDOMINANTELY ALONG THE EXISTING WINDFARM ACCESS ROAD NETWORK AND ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS / 1.9 km away / 25 June 2020Refused
- 1750444SÍNEADH A THÓGÁIL OS COMHAIR AN MHONARCHA ATÁ ANN FAOI LÁTHAIR, ATHSHOCRÚ A DHÉANMAH AR PÁIRCEÁLTA ATÁ ANN CHEANA AGUS SUITEÁIL COMHARTHAÍOCHT FÓGRAÍOCHTA / 2.5 km away / 12 May 2017Refused
- 2251203EXTENSION TO BUILDING PERMITTED UNDER PLANNING REF NO. 17/51091 AND FOR CHANGE OF USE FROM GYM AND TOOL SHED TO TWO GUESTHOUSE SUITES AND PERMISSION FOR CONNECTION TO THE MAINS PUBLIC SEWER / 2.6 km away / 25 August 2022Refused
- 2351160ATTIC DEVELOPMENT FOR 2 SELF CONTAINED APARTMENTS AT FIRST FLOOR LEVEL AND ASSOCIATED SITE WORKS / 2.9 km away / 14 September 2023Refused
- 1951457ERECTION OF A SINGLE STOREY DWELLING HOUSE, DOMESTIC GARAGE, SEWAGE TREATMENT SYSTEM WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS / 3.3 km away / 11 June 2020Refused