BALLYBOE, RAPHOE, LIFFORD PO
Planning application 2350698
DecisionRefused
Decided07 July 2023
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Donegal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Donegal has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near BALLYBOE, RAPHOE, LIFFORD PO?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2351247CONSTRUCTION OF A SINGLE DOMESTIC, TWO STOREY TYPE DWELLING HOUSE, WITH DETACHED DOMESTIC GARAGE WITH SEPTIC TANK SYSTEM & PERCOLATION AREA AND ALL OTHER ASSOCIATED SITE WORKS / 1.7 km away / 05 October 2023Refused
- 2550009CONSTRUCTION OF A DWELLING HOUSE, DOMESTIC GARAGE, SEPTIC TANK / SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS / 2.1 km away / 10 April 2025Refused
- 1850156A TEN YEAR PLANNING PERMISSION FOR A WIND FARM WITH A 30 YEAR OPERATIONAL LIFE (FROM THE DATE OF COMMISSIONING OF THE ENTIRE WIND FARM) AND ALL ASSOCIATED WORKS. THE PROPOSED DEVELOPMENT WILL CONSIST OF THE FOLLOWING: UP TO 6 NO. WIND TURBINES WITH AN OVERALL BLADE TIP HEIGHT OF UP 135 METRES AND ALL ASSOCIATED FOUNDATIONS AND HARD-STANDING AREAS, 1 NO. BORROW PIT, 1 NO. PERMANENT ANEMOMETRY MAST UP TO A HEIGHT OF 100 METRES, UPGRADE OF EXISTING AND PROVISION OF NEW SITE ACCESS ROADS AND ASSOCIATED DRAINAGE, 1 NO. ELECTRICAL SUBSTATION COMPOUND, WHICH WILL HAVE 1 NO. CONTROL BUILDING, ASSOCIATED ELECTRICAL PLANT AND EQUIPMENT, AND A WASTE WATER HOLDING TANK. 1 NO. TEMPORARY CONSTRUCTION COMPOUND, ALL ASSOCIATED UNDERGROUND ELECTRICAL AND COMMUNICATIONS CABLING CONNECTING THE TURBINES TO THE PROPOSED ON-SITE SUBSTATION, AS WELL AS ON-SITE UNDERGROUND CABLING TO FACILITATE ELECTRICAL CONNECTION TO THE NATIONAL GRID, AND ALL ASSOCIATED SITE DEVELOPMENT WORKS, INCLUDING AMENITY TRAILS ON WIND FARM ROADS, CAR PARKING, SEATING/BENCHES AND SIGNAGE. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) AND A NATURA IMPACT STATEMENT (NIS) HAVE BEEN PREPARED IN RESPECT OF THE PROPOSED DEVELOPMENT / 2.2 km away / 20 May 2019Refused
- 2251291CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE, SEPTIC TANK/SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS / 2.2 km away / 15 September 2022Refused
- 2051289ERECTION OF A DWELLING HOUSE AND WASTE WATER TREATMENT SYSTEM / 2.9 km away / 05 November 2020Refused
- 2151877CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE, SEPTIC TANK/SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS / 3.1 km away / 11 November 2021Refused
- 2561080CONSTRUCTION OF A ROOFED SILAGE PIT AND MEAL STORE IN EXISTING FARMYARD AND ALL ASSOCIATED SITE WORKS / 3.2 km away / 08 August 2025Refused
- 1950360DEMOLITION OF EXISTING DWELLING HOUSE AND CONSTRUCTION OF A REPLACEMENT DWELLING HOUSE, DETACHED DOMESTIC GARAGE, SEPTIC TANK/SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS / 3.4 km away / 02 May 2019Refused