GrantedDecided 30 September 2024Donegal County Council

ÓSTÁN GHAOTH DOBHAIR, BÓTHAR NA TRÁ, AN BUN BEAG

Planning application 2460121
DecisionConditional grant
Decided30 September 2024
Application typePERMISSION
Source documents1

Site

What is on file

0refusal reasons0conditions8nearby records

Proposed development

Application description published by Donegal County Council.
REFURBISHMENTS, ALTERATIONS & EXTENSIONS OF EXISTING PART TWO-STOREY / PART THREE STOREY HOTEL BUILDING CONSISTING OF: (1) DEMOLITION OF EXISTING STAIRCORE (46.5 SQ/M) ON THE EAST ELEVATION AND REPLACEMENT WITH NEW STAIRCORE (198 SQ/M) FROM LOWER GROUND FLOOR LEVEL TO THE PROPOSED NEW SECOND FLOOR LEVEL WITH NEW PLANT ROOM AT LOWER GROUND FLOOR LEVEL AND NEW HOUSEKEEPING/STORAGE ROOMS AT GROUND, FIRST AND SECOND FLOOR LEVELS, (2) REFURBISHMENT OF EXISTING PART TWO STOREY, PART THREE STOREY CONCRETE STRUCTURE, (3) ALTERATIONS TO INTERNAL LAYOUTS AT EXISTING LOWER GROUND FLOOR, GROUND FLOOR AND FIRST FLOOR LEVELS (3,003 SQ/M) PROVIDING NEW RECEPTION/ADMINISTRATION AREA, BAR/RESTAURANT, CUSTOMER TOILET/KITCHEN/STAFF FACILITIES/PLANT AND 69 GUEST BEDROOMS, (4) PROPOSED NEW ADDITIONAL SECOND FLOOR (1,337 SQ/M) ABOVE EXISTING BUILDING INCORPORATING NEW FULLY SERVICED WEDDING VENUE/FUNCTION ROOM, BAR/RESTAURANT PLUS OUTDOOR TERRACE AREA, (5) PROPOSED NEW THREE STOREY EXTENSION (2,029 SQ/M) ATTACHED TO THE NORTH EAST OF THE EXISTING BUILDING TO PROVIDE 11 NEW GUEST BEDROOMS (80 IN TOTAL) AND 15 NO. NEW TWO BEDROOM APARTMENTS, (6) PROPOSED NEW PART SINGLE STOREY, PART FOUR STOREY EXTENSION (266 SQ/M) TO THE SOUTH ELEVATION OF THE EXISTING BUILDING TO PROVIDE EXTENDED KITCHEN FACILITIES, NEW LIFTS, STAIRCORE AND EXTERNAL TERRACE AREAS, (7) PROPOSED EXTENSIONS TO NORTH AND SOUTH ELEVATIONS OF THE EXISTING BUILDING TO PROVIDE FOR REVISED ELEVATIONAL TREATMENT AND EXTERNAL BALCONIES AT GROUND AND FIRST FLOOR LEVELS, (8) ALTERATIONS AND REFURBISHMENT OF EXISTING HEALTH AND BEAUTY SPA (632 SQ/M) ATTACHED TO THE WEST OF THE HOTEL BUILDING, (9) REPLACEMENT OF EXISTING ONSITE WASTEWATER TREATMENT FACILITIES AND PERCOLATION AREAS WITH NEW ONSITE WASTEWATER TREATMENT SYSTEM AND PERCOLATION AREAS, (10) REFURBISHMENT OF EXISTING CAR PARKING FACILITIES AND CONSTRUCTION OF ADDITIONAL CAR PARKING AREAS TO ACCOMMODATE 143 NO. CAR PARKING SPACES IN TOTAL AND 30 NO. BICYCLE PARKING SPACES AND (11) ALL ASSOCIATED SITE DEVELOPMENT AND LANDSCAPING WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION.

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Donegal has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near ÓSTÁN GHAOTH DOBHAIR, BÓTHAR NA TRÁ, AN BUN BEAG?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →