TEACH EALA, KILLINDARAGH, CROLLY
Planning application 2550129
DecisionConditional grant
Decided07 November 2025
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Donegal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Donegal has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near TEACH EALA, KILLINDARAGH, CROLLY?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2460250INSTALLATION OF A NEW TREATMENT SYSTEM AND POLISHING FILTER IN LIEU OF EXISTING SEPTIC TANK SYSTEM / 0.2 km away / 18 April 2024Granted
- 2350819TEACH CÓNAITHE AGUS CORÁS SEARACHAIS AGUS LIMISTÉAR SÍOTHAILTHE A THÓGÁIL / 0.3 km away / 28 September 2023Granted
- 2150179ERECTION OF 6 NO. ONE BEDROOM INDIVIDUAL GLAMPING PODS, A RECEPTION BUILDING AND SEPTIC TANK / 0.3 km away / 01 April 2021Granted
- 1851288(A) INCREASING THE ROOF PITCH AND RAISING THE ROOF HEIGHT, (B) ADDING ROOF LIGHTS TO THE FRONT & REAR ROOF ELEVATIONS AND SOLAR PANELS TO FRONT ELEVATION, (C) DEVELOPING ROOMS ON THE FIRST FLOOR, (D) CHANGING FRONT DOOR TO WINDOWON FRONT ELEVATION, (E) CHANGING SLIDING DOORS ON SIDE ELEVATION TO A SINGLE DOOR WITH A GLASS PANEL (WEST ELEVATION ON FRONT PROJECTION), (F) ADDING PATIO DOORS TO REAR EXTENSION ON WEST ELEVATION AND ADDING A SMALL WINDOW ON EAST ELEVATION, (G) ADDING A NEW CHIMNEY, (H) ADDING A NEW WINDOW TO EAST SIDE ELEVATION ON FIRST FLOOR AND NEW WINDOW TO WEST SIDE ELEVATION ON FIRST FLOOR, (I) REMOVING WINDOW FROM REAR ELEVATION FOR BEDROOM NO. 3 AND ADDING NEW WINDOW TO SIDE ELEVATION (WEST) FOR THAT BEDROOM AND (J) A SUPPORTING COLUMN TO FRONT ELEVATION TO CARRY ROOF AND ALL ASSOCIATED SITE DEVLOPMENT WORKS / 0.3 km away / 11 October 2018Granted
- 2151028ERECTION OF A SUNROOM EXTENSION TO THE FRONT OF DWELLING HOUSE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS / 0.4 km away / 04 November 2021Granted
- 1950104EXISTING VEHICULAR ENTRANCE AND ACCESS ROAD AND MOBILE HOME PLACED TEMPORARILY ON SITE TO BE REMOVED ON COMPLETION OF RENOVATION WORKS AND CONSTRUCTION OF A STOREY AND A HALF EXTENSION TO SIDE OF EXISTING DWELLING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS / 0.4 km away / 23 May 2019Granted
- 1850314MION -DHRÍOGHLAINNE UISCE BEATHA AGUS SPIORAID A CHRUTHÚ, GO MAITH LE HIONAD CUAIRTEOIRÍ (1) LEAGAINT AN STÓR AGUS AN OIFIG ATÁ SCOITE AMACH ÓN PHRÍOMH-FHOIRGNIMG CHOMH MAITH LE LEAGAINT AN SEOMRA COIRE ATÁ CEANGAILTE LEIS AN PRÍOMH-FHOIRGNIMH FÉIN (2) ATHRÚ ÚSÁDE CUID DEN MHONARCHAN Ó DÉANTÚSAÍOCHTA GO HIONAD DO CHUAIRTEOIRÍ, SIOPA, BIALANN, BAR AGUS CISTINEACH, DEISIÚ GINEARALTA AGUS/NO ATHNUACHAN AR CHLÚDACH TÓGÁLA AN FHOIRGNIMH, ATHRUITHE ARDAITHE AGUS COMHAIRTHAÍOCHTA (3) LIMISTÉIR, TÍOMÁNA AGUS PÁIRCEÁLA TRÁCHTA A CHRUTHÚ DO CHUAIRTEOIRÍ LE COIS MION OIBREACHA SUÍOMH EILE A BHAINEANN LEIS AN TÓGRA SEO. / 0.5 km away / 01 June 2018Granted
- 1850495CONSERVATORY EXTENSION TO DWELLING HOUSE INCLUDING ALL ASSOCIATED SITE WORKS / 0.5 km away / 25 May 2018Granted