FINCASHEL, PETTIGO, DONEGAL PO
Planning application 2560275
DecisionConditional grant
Decided17 April 2025
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Donegal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Donegal has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near FINCASHEL, PETTIGO, DONEGAL PO?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 1951314(1) THE REDUCE LEVEL DIG TO THE NORTH WESTERN BOUNDARY FOR ACCESS TO AN INCREASED BIO FILTER (ODOUR CONTROL SYSTEM) (2) CHANGE OF USE FROM EXISTING STORAGE SHED TO ENGINEERING WORKSHOP (3) EXTENSION OF THE MAIN STORAGE SHED TO PROVIDE ADDITIONAL WOODCHIP AND BIOMASS PROCESSING AREA (4) EXTENSION OF EXISTING REINFORCED BOUNDARY WALL (5) UNDERGROUND STORM WATER ATTENUATION & SETTLEMENT TANK AND TO INCLUDE ALL ASSOCIATED SITE WORKS / 0.2 km away / 02 July 2020Granted
- 2150194RETENTION OF (1) EXTENSION TO THE EXISTING OFFICE, LOCATED ALONG THE SOUTH EASTERN BOUNDARY, WHERE SAME EXTENSION IS IN THE FORM OF TWO PREFABRICATED UNITS (2) THREE PREFABRICATE UNITS FOR USE AS; CANTEEN, STAFF WELFARE AND OFFICE STORE, ALL OF WHICH ARE LOCATED TOWARDS THE SOUTH EASTERN CORNER OF THE SITE (3) GENERAL STORAGE UNIT, IN THE FORM OF STEEL LORRY CONTAINER, LOCATED AT SOUTH EASTERN CORNER OF THE SITE (4) GENERAL STORAGE UNIT, IN THE FORM OF STEEL LORRY CONTAINER, LOCATED APPROXIMATELY MID WAY ALONG THE SOUTH WESTERN BOUNDARY (5) PREFABRICATED SWITCHROOM / COMMS. UNIT, LOCATED TOWARDS THE NORTH EAST BOUNDARY, AT THE REAR OF THE MAIN STORAGE / PROCESSING SHED AND PERMISSION FOR (1) CONSTRUCTION OF A CONCRETE BUILD MV SUBSTATION BUILDING AND ASSOCIATED SWITCHROOM (2) ALL ANCILLARY SITE DEVELOPMENT WORKS / 0.2 km away / 25 March 2021Granted
- 2150088(1) 3 BAY EXTENSION TO THE SOUTH WEST SIDE OF THE EXISTING MAIN STORAGE / PROCESSING SHED (2) REVISED SITE BOUNDARY, TO INCLUDE AN EXTENSION TO THE EXISTING YARD TOWARD THE NORTH WEST OF THE SITE (3) UPGRADED REPLACEMENT OF THE EXISTING BIOFILTER, WHERE SAME STRUCTURE COMPRISES OF CONCRETE RETAINING WALLS, AN ASSOCIATED MONO-PITCH ROOFED SHED MEASURING 69.4M LONG AND ASSOCIATED INFRASTRUCTURE (4) ALL ANCILLARY SITE DEVELOPMENT WORKS / 0.2 km away / 11 March 2021Granted
- 1750366(1) EXTENSION TO THE EXISTING YARD TO THE SOUTH WESTERN BOUNDARY TO PROVIDE LORRY TURNING AND STORAGE SPACE WHICH WILL INCLUDE A LANDSCAPED EARTH EMBANKMENT WITH 1.80m FENCE TO THE SAID BOUNDARY; (2) STAND ALONE TOP SOIL STORAGE SHED TO THE WESTERN PART OF THE SITE; (3) A LEAN TO EXTENSION TO THE FRONT GABLE END OF THE EXISTING COMPOSTING STORAGE SHED AND (4) IN SITU CAST BIO-FILTER STRUCTURE TO THE NORTH SIDE ELEVATION OF THE EXISTING COMPOSTING STORAGE SHED ALONG WITH ALL ASSOCIATED SITE WORKS / 0.2 km away / 05 May 2017Granted
- 2251327(1) INTENSIFICATION OF THE EXISTING COMPOSTING AND WASTE RECOVERY ACTIVITIES FROM AN ANNUAL TONNAGE OF 25,000 TONNES TO 150,000 TONNES, (2) UPGRADING OF THE EXISTING SURFACE WATER DRAINAGE INFRASTRUCTURE, AN UPGRADED ON-SITE WASTEWATER TREATMENT SYSTEM (OSWTS) WITH SOIL POLISHING FILTER, (3) PROVISION OF ADDITIONAL CAR PARKING AREA AND (4) ALL ANCILLARY SITE DEVELOPMENT WORKS. A LICENCE FROM THE ENVIRONMENTAL PROTECTION AGENCY IS REQUIRED FOR THIS ACTIVITY. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) ACCOMPANIES THIS APPLICATION / 0.2 km away / 12 January 2023Granted
- 2151560CONSTRUCTION OF A PORTAL FRAMED SHEEP SHED, WITH STORAGE TANK BELOW, CONCRETE APRON TO INCLUDE ALL ASSOCIATED SITE WORKS / 0.4 km away / 23 September 2021Granted
- 1951139ERECTION OF A PART SINGLE STOREY / PART TWO STOREY DWELLING, DETACHED DOMESTIC GARAGE, NEW SITE ENTRANCE, EFFLUENT TREATMENT SYSTEM & PERCOLATION AREA AND ASSOCIATED SITE WORKS / 0.6 km away / 05 December 2019Granted
- 2051622(1) RELOCATION & AMENDMENT TYPE OF DOMESTIC GARAGE PREVIOUSLY GRANTED UNDER PLANNING REF: 08/20870 AND (2) CONNECTION INTO EXISTING ON-SITE SURFACE WATER DRAINAGE & ALL ASSOCIATED SITE WORKS / 0.7 km away / 18 December 2020Granted