CHURCH STREET, ARDARAVAN, BUNCRANA LIFFORD PO
Planning application 2561726
DecisionConditional grant
Decided14 May 2026
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Donegal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Donegal has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near CHURCH STREET, ARDARAVAN, BUNCRANA LIFFORD PO?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2152606(1) DEMOLITION OF AN EXISTING SINGLE-STOREY GARAGE AND (2) CONSTRUCTION OF A NEW TWO-STOREY, THREE BEDROOM DETACHED DWELLING AT CHURCH STREET ALONG WITH CONNECTIONS TO EXISTING SERVICES, AMENDMENTS TO EXISTING VEHICULAR ENTRANCE AND A NEW PARKING AREA FOR THE DWELLING / 0.0 km away / 24 February 2022Granted
- 2561386(A) RELOCATION OF EXISTING FRONT BOUNDARY AND ENTRANCE (B) RENOVATION AND EXTENSION OF EXISTING DWELLING, EXTENSION WILL BE TO THE SIDE OF DWELLING AND WILL INCORPORATE A KITCHEN AND DINING AREA AND ALL ASSOCIATED SITE DEVELOPMENT WORKS / 0.0 km away / 25 September 2025Granted
- 2251664ERECTION OF A DWELLING WITH CONNECTION TO EXISTING MAINS SEWER AND PUBLIC SERVICES / 0.1 km away / 24 November 2022Granted
- 2151446CONSTRUCTION OF (1) AN EXTENSION TO EXISTING CLASSROOMS TO CONTAIN A NEW PREP ROOM AND STORE AND ALL ASSOCIATED ALTERATIONS (2) AN EXTENSION TO THE EXISTING STAFFROOM (3) AN EXTENSION TO AN EXISTING ENTRANCE LOBBY AND ALL ASSOCIATED ALTERATIONS TOGETHER WITH ALL ASSOCIATED SITE WORKS INCLUDING CONNECTION TO EXISTING ON SITE SERVICES / 0.1 km away / 09 September 2021Granted
- 2050744ERECTION OF 2.4M GALVANISED FENCE AROUND SPORTS GROUND AND ALL ASSOCIATED SITE WORKS / 0.1 km away / 23 July 2020Granted
- 17508982 NO. NEW PRE-FABRICATED CLASSROOMS AND RETENTION PERMISSION FOR 7 NO. TEMPORARY PRE-FABRICATED CLASSROOMS, CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED SITE WORKS AT CRANA COLLEGE / 0.1 km away / 21 September 2017Granted
- 2051923CONSTRUCTION OF 2NO DWELLINGS WITH CONNECTION TO EXISTING MAINS SEWER AND PUBLIC SERVICES / 0.1 km away / 04 February 2021Granted
- 1850849RETENTION OF THE CHANGE OF USE OF RESIDENTIAL DWELLING TO SECOND LEVEL CLASSROOMS AND FOR THE CONSTRUCTION OF 2 NO. TEMPORARY CLASSROOMS, CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED SITE WORKS / 0.1 km away / 11 October 2018Granted