ROSHIN NORTH, BURTONPORT, LETTERKENNY PO
Planning application 2660953
DecisionConditional grant
Decided09 July 2026
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Donegal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Donegal has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near ROSHIN NORTH, BURTONPORT, LETTERKENNY PO?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 1950608CONSTRUCTION OF A NEW DWELLING WITH INTEGRATED GARAGE AND WASTE WATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS / 0.1 km away / 13 June 2019Granted
- 2460620ERECTION OF A DWELLING HOUSE WITH DOMESTIC GARAGE AND SEPTIC TANK SYSTEM WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS / 0.1 km away / 20 June 2024Granted
- 1952001ERECTION OF A DWELLING HOUSE WITH DOMESTIC GARAGE AND THE INSTALLATION OF A SEPTIC TREATMENT SYSTEM WITH ASSOCIATED DRAINAGE/PERCOLATION AREA AND SITE WORKS / 0.3 km away / 20 February 2020Granted
- 2461721INSTALLATION OF A 12-METRE HIGH STOUT WOODEN POLE SUPPORTING 2 NO. RADIO-LINK DISHES, TOGETHER WITH EQUIPMENT CABINET, ENCLOSING FENCE AND GATE, FIBRE DUCTING AND CHAMBERS, FOUNDATION AND ALL ASSOCIATED ANCILLARY DEVELOPMENT WORKS INCLUDING A WALKWAY FROM THE EXISTING JETTY TO THE ELECTRONIC COMMUNICATIONS SITE. THE DEVELOPMENT IS REQUIRED TO CARRY THE BROADBAND DATA FROM THE NEW HIGH SPEED FIBRE BROADBAND NETWORK ON THE ISLAND, TO THE MAINLAND BY RADIO LINK, TO CONNECT TO THE NBI NATIONAL FIBRE NETWORK, AS PART OF THE GOVERNMENT’S NATIONAL BROADBAND PLAN TO PROVIDE HIGH SPEED BROADBAND TO ALL PARTS OF THE COUNTRY THAT ARE NOT AVAILABLE COMMERCIALLY, INCLUDING THE ISLANDS, AT THE SAME DATA SPEED / 0.3 km away / 13 December 2024Granted
- 2550163CONSTRUCTION OF A GARAGE TO THE SOUTH SIDE OF DWELLING HOUSE WITH ASSOCIATED DRAINAGE AND SITE WORKS / 0.4 km away / 15 January 2026Granted
- 2450255CONSTRUCTION OF A NEW DWELLING HOUSE AND INSTALLATION OF A WASTEWATER TREATMENT SYSTEM WITH ALL ASSOCIATED DRAINAGE AND SITE WORKS / 0.4 km away / 14 August 2025Granted
- 2461192(1) SUN ROOM BUILT TO THE FRONT ELEVATION OF EXISTING DWELLING HOUSE, (2) TWO-STOREY EXTENSIONS BUILT TO THE REAR OF THE DWELLING HOUSE, (3) PITCHED ROOF TO THE DWELLING HOUSE IN LIEU OF AN ORIGINAL FLAT ROOF STRUCTURE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS / 0.5 km away / 19 September 2024Granted
- 2561176CONSTRUCTION OF A DWELLING HOUSE, DOMESTIC GARAGE AND WASTEWATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS / 0.6 km away / 21 August 2025Granted