GrantedDecided 01 March 2019Dublin City Council

2022/19: The development will consist of 1. Demolition of existing derelict two storey property and workshop located to the rear of the existing property 2. Construction of a retail unit (100sq.m) at ground floor level 3. Construction of 3 number two bedroom apartments (73 sq.m) at first, second and third floor levels, and for construction of 1 number one bedroom apartment ()58sq.m) at fourth floor level, including for the provision of private balconies to each apartment 4. For the provision of all access hallways, stairs and lift to the proposed residential units (4 in total) 5. For the provision of private open space amenities by the way of a walled garden 6. To connect the proposed development to adjoining public services, such as foul and surface water sewer and also to the adjoining public water main 7. The floor area of the entire 5 storey development will be 511 sq.m with the overall height of 14.5m 8. And for all associated site development works.

5, Echlin Street, Dublin 8
DecisionGrant permission
Decided01 March 2019
Application typePermission
Source documentsPending

Site

What is on file

0refusal reasons0conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Dublin City has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near 5, Echlin Street, Dublin 8?

Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Source link pending

This application was published at source, but the document inventory has not been bound yet.

Nearby precedent

Similar nearby applications linked to this planning decision.
Full reasons for every nearby decision are in the site report →