2397/19: Change of use of part of ground floor office to yard together with the removal of glazed roof over, construction of new separating wall to new yard incorporating access door & necessary ancillary works.
1-5, Crampton Court, Temple Bar, Dublin 2
DecisionGrant permission
Decided25 April 2019
Application typePermission
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dublin City has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- 5053/23To extend our premises and access an area of 72.0m2 at ground floor by seeking a Change of use permission from Retail use to Leisure use of the existing retail unit. / 0.0 km away / 20 May 2024Granted
- 3219/22PROTECTED STRUCTURE: Planning permission for development at this site at nos,72 (3Olympia Theatre - Eircode D02 K135), 73 Dame Street (3Olympia Theatre Ticket Office - Eircode D02 V597) and Crampton Court, Dublin 2 (no 72 Dame Street is a protected structure). The proposal relates to new pediment signage (replacement of interim signage permitted under DCC Reg. Ref.: 2879/20), replacement shopfront to no. 73 Dame Street and repairs to the entrance area. The development will consist of the replacement of 2 no. wall mounted signs facing Dame Street (on nos. 72 and 73 Dame Street) with 3 no. anodised aluminium fins to form an arching signage canopy fixed top and bottom with diagonal supports fixed into the masonry walls at no.72 Dame Street. Refurbishment of the ground floor facades of 72 and 73 Dame Street including: repainting of decorative panelling; removal of existing modern security shutter; the repair and removal of non-original and non-historic joinery from the historical fabric; repair of historic panelling; consolidation of glazed bars; replacement of architraves and panel mouldings with decorative elements; minor repairs to mosaic floor; refurbishment and repainting of the existing panelling and joiner details; the construction of a contemporary 12 no glass panelled window presenting a new LED advertisement screen behind and the installation of new joinery to the ticket office and doorway at 73 Dame Street. The total area of signage proposed extends to c. 16.54 sqm. / 0.0 km away / 02 February 2023Granted
- WEB5949/25PROTECTED STRUCTURE: Planning permission is sought at No. 77-78, Dame Street,Dublin 2 D02 RK60 (a protected structure) by Long Real EstateLimited for the change of use of the existing property at first, second, third& fourth floors from former commercial / office to use as a single residential unit. Alteration of internal of layout at each floor to provide for Living area, 8 No. bedrooms, revised bathroom & Kitchen facilities, amendment to existing rooflights to rear & side and an additional roof dormer window to the inner valley roof. / 0.0 km away / 13 February 2026Granted
- WEB1570/25PROTECTED STRUCTURE: Planning permission is sought for the change of use of the existing property at first, second, third & fourth Floor from former commercial/office to use as a language school. Remedial works the front elevation of building including retention and improvement of the Seiko signage. Repair & upgrade of existing sliding sash windows to fore & replacement of windows to rear with correct timber sliding sash windows. Alteration of internal of layout ground, first, second & third floor to provide for revised bathroom facilities. / 0.0 km away / 23 October 2025Granted
- 3325/19PROTECTED STRUCTURE: Planning permission for the following: (a) Interconnection of second, third and fourth floors of Dollard House with the half-landings of a late twentieth century internal staircase of The Clarence Hotel and the construction of a lightweight bridging structure/corridor in the Clarence Hotel at aforementioned three levels to connect through new openings in the external cladding of a late twentieth century stairs located in an internal lightwell, with lightweight cladding to match; (b) Dollard House only: change of use of second, third and fourth floors from vacant offices to hotel use, comprising 56 bedrooms and ancillary spaces. Dollard House was originally interconnected to and formed part of The Clarence Hotel on these three levels: the construction of new lightweight stud partitions, doors and ceilings forming bedrooms and corridors; the forming of openings at second, third and fourth floor levels in the east wall, (which had previously existing window openings); the reinstatement of a window opening on the south elevation of the north wing at second floor level; replacement of the existing late twentieth century aluminium windows with historically appropriate timber framed windows to the north elevation facing Wellington Quay and steel framed windows to the window openings facing the internal lightwell and the south elevations facing East Essex Street. / 0.1 km away / 17 December 2019Granted
- WEB2671/24PROTECTED STRUCTURE: Keywell DAC intends to apply for Permission at this site (c.0.17 ha) at No. 1 Essex Street East, Dollard House, Nos. 2-5 Essex Street East and Nos. 2-5 Wellington Quay (Protected Structure), The Clarence Hotel, Nos. 6-8 Wellington Quay and Nos. 6-8 Essex Street East (Protected Structure) and Anne's Bar, No. 8 Essex Street East, Temple Bar, Dublin 2. For development comprising proposed hotel refurbishment, conservation and alteration (c.8,544 sq m gfa total), and vertical roof and infill building extension (c.841 sq m gfa total), to accommodate the addition of 104no. new hotel keys (resulting in 162no. total existing and proposed) and ancillary hotel amenities including retail-bakery, licenced restaurants, bars and event spaces, as follows: - Clarence Hotel: Removal of existing Clarence dormer roof (L04) and plant room (L06) and addition of 1-storey dormer extension (c.256 sqm, L05) above No.6-8 Essex Street East (southern) elevation and Clarence Hotel east elevation, and alteration (subdivision) and refurbishment of Levels 01 to 06 inclusive, to accommodate 37no. additional hotel keys. Ancillary hotel lounge bar/reception area (c.177 sq m), refurbished Octagon Bar (c.78 sq m) and Stout Bar (c.45 sq m) and contemporary music bar (c.133 sq m) at ground floor (L00), and hotel gym (c.88 sqm) and live music venue (c. 269 sq m) at basement level. - Dollard House: Change of use of existing upper floors, from L01 to L04 inclusive, to accommodate 46no. hotel keys; change of ground floor (L00) to use as ancillary restaurant (c.232 sq m), retail bakery-coffee shop (c.96 sqm) and associated kitchen and back-of-house facilities; and new event and banqueting space (c.320 sq m total) at L01. Removal of existing eastern wing dormer roof (L04) at Dollard House and replacement with 1-storey dormer extension (c.95 sq m) to accommodate 2no. new hotel keys (L05) at eastern interface with Clarence Hotel. - No.1 Essex Street East: Change of use of existing upper floors, from L01 to L03 inclusive, to accommodate 3no. hotel keys, and removal of existing roof structure (L04) and addition of 2-storey dormer extension (c.69 sq m) to accommodate 1no. hotel key (duplex, L04-L05), above No.1 Essex Street East. - Anne's Bar, No.8 Essex Street East: Demolition of existing Anne's Bar (c.214 sq m gfa) and construction of a new 6-storey hotel extension (c.635 sq m), to accommodate 15no. hotel keys (L01-L05), replacement licenced bar (c.44 sq m) at ground floor (L00) and back of house facilities at mezzanine level, at No.8 Essex Street East. And all associated and ancillary alteration, refurbishment, repair, conservation, restoration and fit out works, including: Internal reconfiguration works at the Clarence Hotel and Dollard House, including: the reconfiguration of floor plans, partial demolition of load-bearing and non-load bearing walls and partitions, partial stripping back of non-original finishes and features across all floors to both buildings; integration of new services, structural strengthening works and creation of new circulation and service connections through existing walls and floors between all buildings including Dollard House, Clarence Hotel, No.1 Essex Street East and No.8 Essex Street East. Fire resistant lining and enclosure of existing roof timbers and structure of existing Dollard roof. Alterations to the existing Wellington Quay (north) façade to include: replacement of existing fire escape door to reinstate a new window to match existing historic windows at the Clarence at 6-8 Wellington Quay, integration of new wall vents, and replacement of existing service entrance with an additional hotel entrance at Dollard House at 2-5 Wellington Quay. 2no. new dormer roof windows to the north elevation and new windows to east and south elevations at L06 of the Clarence Hotel. Relocation of external plant space to roof (c.90 sq m, L07) and associated external access stairs at the Clarence Hotel. Location of external plant to roof (c.28 sq m, L02) and associated screen to Dollard courtyard. Extension and recladding of 2no. existing ventilation ducts at Clarence east elevation. Replacement and extension of external fire stairs at Clarence roof level (L05-L06). Modification of existing entrance door to form escape route at ground floor of No.1 Essex Street East. Repairs to existing roof fabric including; valleys, gutters, linings, structural timbers, existing dormers, rainwater goods and chimneys and provision of thermal upgrades at both Clarence and Dollard House. Replacement of Dollard House existing upper floor windows on Wellington Quay facade and existing aluminium windows on courtyard and upper floors of East Essex Street façade, with double-glazed windows to match existing. Restoration of existing ground floor windows to the north elevation of The Clarence Hotel, at 6-8 Wellington Quay, to reinstate lead came detailing. Modification of existing finishes to the southern elevation of The Clarence Hotel at L03. Addition of new wall vents to the southern elevation of The Clarence Hotel to match existing. Reconsolidation works post integration of structural and service interventions. / 0.1 km away / 30 April 2025Granted
- 3227/21PROTECTED STRUCTURE: Planning permission for the following to rear of 9, 10 Wellington Quay, Dublin 2 (Protected Structures) and above Anne’s Bar, No. 8 East Essex Street, Dublin 2 (attached to the Clarence Hotel 6-8 Wellington Quay and 6-8 East Essex Street, Dublin 2 (a Protected Structure): a) The provision of a new open-air dining terrace (80sqm) at second floor level above Anne’s Bar and above the existing laundry room at first floor level, with painted steel fascia and glass balustrade; b) The provision of a double-pitched retractable fabric canopy above said terrace; c) The reconfiguration of the existing pedestrian external walkway/stairs between the existing open-air terrace to the rear of Nos. 9, 10 Wellington Quay and the laundry room at first floor level at No 8 East Essex Street (above Anne’s Bar), to provide level access to the proposed new terrace at 2nd floor level on East Essex Street which is equivalent to first floor level on Wellington Quay and to retain the fire escape previously shown through the laundry room below. / 0.1 km away / 22 November 2021Granted
- WEB2094/24PROTECTED STRUCTURE: Permission for development at a site (c. 52.4sqm) at No. 1 Essex Street East, Dublin 2 Within the curtilage, adjoining and connected with Dollard House (Protected Structure) Nos. 2-5 Essex Street East and Nos. 2-5 Wellington Quay to the east and adjoining Nos.16-18 Parliament Street (Protected Structure) to the west. The proposed development comprises the insertion of an ESB substation at ground floor and associated switch room at existing basement level; and all associated works including removal of existing lift shaft and associated internal reconfiguration works, from basement to 3rd floor levels inclusive; alterations to the southern elevation at ground level, including insertion of new substation access doors and replacement of existing timber cladding, doors and windows with similar matching. / 0.1 km away / 04 November 2024Granted