GrantedDecided 15 July 2019Dublin City Council

Ulster Bank, 30-33 College Green and 3-4 Suffolk Street fronting onto Church Lane, Dublin 2, D02 DD76

Planning application 2518/19
DecisionGrant permission
Decided15 July 2019
Application typePermission
Source documentsPending

Site

What is on file

0refusal reasons0conditions8nearby records

Proposed development

Application description published by Dublin City Council.
PROTECTED STRUCTURE: Permission for development at a c. 0.124 ha site at Ulster Bank, 30-33 College Green and 3-4 Suffolk Street fronting onto Church Lane, Dublin 2, D02 DD76 (A Protected Structure, RPS Ref. 1995). The proposed development will consist of the internal refurbishment and fitout of the existing building across 5 no. floors including the retail bank and atrium space at ground floor level. The proposed fitout includes the removal of internal partition walls and the provision of new reconfigured partition walls at ground through fourth floor levels, changing the public access to the existing College Green entrance only, a new underfloor heating system under the atrium floor and the provision of new ventilation, data cabling, power distribution and accessible toilets. The proposed scheme includes the replacement of existing plant and services at roof level with new plant on both the College Green and Suffolk Street roofs, removal of a ventilation duct to the rear of the College Green building, replacement of existing louvres at 5th floor level with new louvres to match existing, the provision of a new extract duct to the rear of the Suffolk Street roof and the replacement of an existing rooflight over the stairwell to the south of the building with a double glazed rooflight to match existing. The existing single-glazed atrium roof will be replaced with a new double-glazed, single pitched atrium roof with ventilation and smoke vents, and a total height lower than existing. Works at second floor roof level to the rear of the College Green building comprise the removal of all existing plant, the replacement of an existing rooflight with a lightweight roof and the provision of 5 no. new condenser units.

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Dublin City is in progress.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near Ulster Bank, 30-33 College Green and 3-4 Suffolk Street fronting onto Church Lane, Dublin 2, D02 DD76?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.

Source documents

Original council portal records and source PDFs where available.

Source link pending

This application was published at source, but the document inventory has not been bound yet.

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →