2622/19: Planning permission for development at this site, the I.B.T.S. Headquarters, the National Blood Centre, St. James's Hospital, James' Street, Dublin D08 NH5R. The development located within Strategic Development and Regeneration Area 15, will consist of the replacement of a 4.24 meter high, 3.66m diameter Liquid Nitrogen Tank with a new 7.18 meter high, 2.5m diameter Liquid Nitrogen Tank, including all associated site works such as foundation reinforcement and services reconnections, all located within the service compound of the I.B.T.S. property.
St. James's Hospital, St James's Street, Dublin 8
DecisionGrant permission
Decided22 May 2019
Application typePermission
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dublin City has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near St. James's Hospital, St James's Street, Dublin 8?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- 4147/22RETENTION: The development consists of the retention for a temporary period of 5 years of a liquid oxygen compound previously part approved (for a temporary period under Reg. Ref. 3040/16) comprising of: a VIE (vacuum insulated evaporator) liquid oxygen primary tank (40,000 litres) of 8.15m in height; 2 no. back-up VIE liquid oxygen tanks (3,000 litres and 10, 500 litres) of 4.38m and 4.9m in height respectively; vapourisers (5.7m in height), concrete plinth, hardstanding area, concrete ramp, aluminium palisade fencing and security fencing (reconfigured from that previously approved); and all other site development works above and below ground required to facilitate the entire development. / 0.1 km away / 26 July 2022Granted
- 3843/19The development will consist of: 1) the demolition of the existing cycle shelter to the north of the site; 2) the provision of a new temporary, two storey prefabricated block - approx. 475 sqm total area - comprising 6 no. mainstream classrooms, ancillary accommodation and sanitary facilities with obscured glazing to the windows on the first floor northern elevation; 3) the repositioning and widening of the entrance gates from Basin View and; 4) all associated site and drainage works. / 0.2 km away / 16 December 2019Granted
- 3357/25The development will consist of: i) the amalgamation of the ground floor retail units to provide for a single retail unit (c.575 sq.m GFA) including an ancillary alcohol sales area (c.32 sq.m); (ii) minor external alterations to the elevations to include automatic sliding entrance door, signage, vinyl window coverings and louvered screens to the internal plant room on the Reuben Street (front) elevation; signage to the James's Walk (side) elevation; and louvered screens to the internal plant room on the Herberton Street (side) elevation; and (iii) all ancillary site services and site development works. The development will also consist of the provision of a loading bay on James's Walk. / 0.2 km away / 15 October 2025Granted
- WEB1521/20RETENTION: The Retention Permission to retain the two storey flat roof extension to the rear and the flat roof dormer window in rear elevation roof plane. / 0.2 km away / 14 September 2020Granted
- 2277/19Planning permission for removal of existing pedestrian access to front and for forming a new vehicular access to public road to front of site and all associated works. / 0.2 km away / 09 April 2019Granted
- 4036/24PROTECTED STRUCTURE. Permission is sought by Trinity College Dublin for permission for the installation of 1 no. free-standing bicycle shelter at Trinity Centre for Health Sciences, Trinity College Dublin, St. James's Hospital, Dublin 8. The proposed development is within the curtilage of a Protected Structure. / 0.2 km away / 10 September 2024Granted
- WEB1697/25The development consists of the renewal of the previously approved temporary permission for the use of the approved retail unit as a display sample room for New Children’s Hospital equipment (under Reference 2200/19) for a further period of five years. / 0.2 km away / 26 May 2025Granted
- 2200/19RETENTION: The development consists of the retention of the use of the approved retail unit as a display sample room for New Children's Hospital equipment for a period of five years. / 0.2 km away / 02 April 2019Granted