2668/21: The development will consist of the change of use of an existing external store, which is to be converted to a boiler room, installation of a boiler and flue and replacement of an existing steel door with a new steel louvered door.
Scoil Chiarain CBS, Collins Avenue East, Donnycarney, Dublin 5
DecisionGrant permission
Decided21 June 2021
Application typePermission
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dublin City has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Scoil Chiarain CBS, Collins Avenue East, Donnycarney, Dublin 5?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- 3463/20The development will consist of: alterations to previously approved permission (3381/16) (1) Reduce kitchen extension by 1.2m, remove canopy. (2) Replace hip roof to extension with flat roof. (3) New attic dormer window to rear pitched roof and finished to match. All services connected to existing. / 0.1 km away / 23 November 2020Granted
- 3363/24RETENTION permission for a new vehicular entrance 3.2m wide to facilitate off street parking. / 0.1 km away / 03 May 2024Granted
- WEB1139/23The development consists of a new two storey extension with flat roofs to the rear of the existing terraced house and all associated site works. / 0.1 km away / 19 April 2023Granted
- 3054/21The development will consist of a proposed new detached ground floor only building to the rear of the existing site to be used as a gym/games room and all ancillary works. / 0.1 km away / 10 November 2021Granted
- 2094/21The development will consist of a proposed new ground floor only extension to the rear of the existing house and all ancillary works. / 0.1 km away / 22 March 2021Granted
- 2805/19Permission for the provision of a new standalone single storey childcare preschool/afterschool prefabricated structure containing 2 no. classrooms and ancillary areas (floor area = 137.8sqm) to the rear of the existing two storey School Building, together with all associated site works. / 0.1 km away / 12 June 2019Granted
- 4200/24Permission development at this site: 138 Collins Avenue East, Dublin 5. The proposed development will consist of alterations of the existing front boundary wall to allow new vehicular access to front of existing dwelling and all associated site works. / 0.1 km away / 17 October 2024Granted
- WEB1337/23Dublin City Council. I, David Bracken, seek planning permission for the refurbishment and ground floor extension to the rear, two storey extension to the side and new boundary wall to the north boundary of a two storey semi detached house at number 3 Clanree Road, Donnycarney, Dublin 5. The proposed development will consist of the erection of a partial width flat roof ground floor extension to the rear of 10 m2 and a double height hipped roof extension of 45 m2 to the side of the existing house to give a total extended area of 55 m2 (total existing and proposed house area is 113 m2). The proposed development will also consist of general remedial works to the ground floor layout to include removal of walls to provide for a open plan living space with kitchen to rear and dining/ lounge area to side and front with new downstairs wc and utility room and general remedial works to the first floor layout to include the removal of section of side wall to cater for access to two new bedrooms in the side extension. The proposed development will also provide for a new white rendered masonry raised height boundary wall to the northern boundary and all associated site, drainage and landscaping works. / 0.2 km away / 15 June 2023Granted