GrantedDecided 30 October 2020Dublin City Council

2742/20: Permission at Nos. 1-6 Haymarket, Nos. 56-58 Smithfield, including Smithfield Chambers, Smithfield, Dublin 7 (the site is bounded by Haymarket to the north; Arran Quay Terrace to the south, Burgess Lane to the west and Smithfield to the east). The proposed development consists of amendments to a previously permitted development under DCC Planning Ref. 3475/19 to include the following: (a) Omission of Condition 4 (requiring the provision of shower and changing facilities for each office floor to cater for cyclists employed in the building) to provide separate male, female and disabled persons changing and shower facilities along with cycle storage facilities at Basement -2 level only, to cater for cyclists employed in the building; (b) External alterations include the removal of the permitted roof-top plant and the provision of a new sixth and seventh floor (measuring approximately 2,274 sq.m (GFA) extension that will deliver an additional 1,810 sq.m of office floor space (NIA). The proposed extension is set back from the eastern facade to provide an east facing roof terrace at sixth floor level. A combination of enclosed rooftop plant rooms and open rooftop plant areas with associated plant screening that measure approximately 2.7m in height (above rooftop level) is provided along with Photo Voltaic (PV) panels and green roofed areas. In the interest of clarity it should be noted that no changes are proposed at basement to fifth floor levels (with the exception of the omission of Condition 4) of the previously permitted scheme under DC Ref. 3475/19.

1-6, Haymarket; Nos. 56-58 Smithfield, including Smithfield Chambers, Smithfield, Dublin 7 (the site is bounded by Haymarket to the north, Arran Quay Terrace to the south; Burgess Lane to the west and Smithfield to the east)
DecisionGrant permission
Decided30 October 2020
Application typePermission
Source documentsPending

Site

What is on file

0refusal reasons0conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Dublin City has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near 1-6, Haymarket; Nos. 56-58 Smithfield, including Smithfield Chambers, Smithfield, Dublin 7 (the site is bounded by Haymarket to the north, Arran Quay Terrace to the south; Burgess Lane to the west and Smithfield to the east)?

Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Source link pending

This application was published at source, but the document inventory has not been bound yet.

Nearby precedent

Similar nearby applications linked to this planning decision.
Full reasons for every nearby decision are in the site report →