2837/20: The development will consist of the erection 2 no. perforated PVC face film signs on parts of the ground floor windows of the building - a 7.4 m x 3 m sign on the northern (St John's Road West) elevation and a 4.4m x 1.3 m sign on the southern elevation.
AIB, 2, Heuston South Quarter, St John's Road West, Dublin 8, D08 A9RT
DecisionGrant permission
Decided31 July 2020
Application typePermission
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dublin City has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near AIB, 2, Heuston South Quarter, St John's Road West, Dublin 8, D08 A9RT?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- 3372/22The proposed development consists of the amalgamation of 2 no. ground floor retail units (Units 8 & 9) and a change of use to office, together with all associated and ancillary internal and external alterations to provide a single office unit of 146.3 sqm. Internal alterations include the removal of an existing internal partition wall and the provision of a kitchenette and toilets (including accessible toilet) to serve the office unit. External alterations along the northern (front) elevation include the provision of a signage area above the existing entrance to Unit 8 and the replacement of an existing access door (Unit 9 access door) with glazing. / 0.1 km away / 14 April 2022Granted
- WEB1554/25Permission for a change use of 163.6 sq.m of an existing single storey vacant retail space to a new Credit Union Branch. The works will include replacement of the existing façade curtain wall spandrel panels with louvred panels to facilitate ventilation withing the unit and new building ID signage over the entrance doors. / 0.1 km away / 08 May 2025Granted
- 4377/22Permission for the continuation of temporary use, as previously granted under planning permission reference number 3295/10 and 3614/17 of the existing development at this site at the junction of St. John's Road West and Military Road, Kilmainham, Dublin 8 with access from Military Road. Kilmainham. The existing development consists of the installation of service plant items to facilitate the operations of the existing data centre. The service plant is currently housed in a number of cabins on a temporary basis. Planning permission is sought for a period of ten years. The existing service plant items and cabins are as follows: 2 no. 12m x 3m plant enclosures, 4 no. 3.5m x 2.2m plant enclosures, 2 no. 7m x 3.2m cabins, 4 no. 5.5 x 2.4m cabins, 2 no. 3.5m x 3.5m cabins, 1 no. cabin housing a pump station, 1 no. 5.7m x 4.5m cabin and 2no. 4m x 3m oil tanks. The existing development also includes a temporary fence and gate on Military Road, which replaced the previous fence and gates and associated site development works within the site. / 0.1 km away / 25 August 2022Granted
- 4128/24The proposed development comprises the construction of a new extended mezzanine level (at ground level) to provide additional floor space (extended by approximately 161.4 sq.m) in connection with the existing gymnasium use permitted under DCC Planning Ref. 2551/15. The layout of the proposed mezzanine floor space will integrate with the existing office floor space permitted under DCC Planning Ref. 2366/18 but in a reconfigured manner to include a change of use of permitted office space to an ancillary canteen in connection with the gymnasium. The proposed development includes all associated/ancillary works and connection to services. / 0.2 km away / 30 September 2024Granted
- 3793/19The proposed development is to replace the existing internal advertising paper panel with a digital display screen. The dimensions of the advertising panel on the external side will remain the same. The proposed new advertising unit has an overall height of 2.1462m, a depth of 0.305m and a width of 1.34m, with a digital display area of 1.52m2. / 0.3 km away / 10 October 2019Granted
- 4125/24The development will consist of: (i) Removal of existing chimney stack, (ii) Roof extension at first floor level to provide a 3-storey, pitched roof dwelling, (iii) The provision of a new dormer window to the front, and (iv) All ancillary works necessary to facilitate the development. / 0.3 km away / 24 January 2025Granted
- 4281/24The development will consist of a change of use of petrol filling station to provide bus parking and all associated site works including new boundary treatment to the Northern side of the site adjacent to Conyngham Road. This proposal also seeks to remove the hoarding to the boundary facing Conyngham Road. The site at present is derelict and has not been used as a petrol filling station since 2019. Vehicular access and egress will be by existing dished kerb entrance to the eastern side of the site. A new pedestrian entrance from Conyngham Road will also be created. / 0.3 km away / 07 November 2024Granted
- 3344/20PROTECTED STRUCTURE: The development will consist of the demolition of the existing HUI Building at Dr. Steeven's Hospital, Dublin. The development will be carried out within the curtilage of a protected structure. (Dr. Steeven's Hospital - reference 7840). / 0.3 km away / 03 November 2020Granted