2891/21: Permission involving the change of use of a community education building to residential use (1 four-bed dwelling unit) including removal of external shutters from doors/windows, removal of polycarbonate roof to the rear, interior alterations including addition of an ensuite, removal of a sink and double doors, and reconfiguration of an existing bathroom, change of use of the rear studio building to office/gym use and all associated site works.
61, Elmdale Crescent, Cherry Orchard, Ballyfermot, Dublin 10
DecisionGrant permission
Decided28 July 2021
Application typePermission
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dublin City has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- 2030/20RETENTION: Retention Permission is sought for single storey extension to the side and associated site development to dwelling house at Saint John, 27 Elmdale Crescent, Dublin 10. / 0.1 km away / 05 March 2020Granted
- 3966/21RETENTION: Permission for a detached single storey gym/office/storage shed to rear of existing house with ancillary works. / 0.1 km away / 01 February 2022Granted
- 4886/23Permission for the construction of a two- storey classroom building for additional crèche facilities and all associated site development works to the east elevation at the south corner of St. Ultan's Campus. / 0.3 km away / 11 June 2024Granted
- 4735/23PERMISSION:For the construction of an ASD School Playground area and all associated site development works to the west elevation at south corner of the St. Ultan's Campus, Cherry Orchard Ave, Cherry Orchard, Dublin 10. / 0.3 km away / 03 January 2024Granted
- 3591/23Permission to amend part of previously approved reg ref (5145/22) previously described as single storey detached temporary accommodation unit to southeast of site of 200.39m2 to relocate Training & Education Services at Blackthorn Unit, Cherry Orchard Hospital Campus, Ballyfermot Road, Ballyfermot, Dublin 10. Permission is now sought to provide for a permanent structure of similar layout and associated works in perpetuity. / 0.3 km away / 13 June 2023Granted
- 5145/22Planning permission for the following development: 1) New single-storey detached temporary accommodation unit to southeast of site of 200.39m2, to relocate Training & Education Services. 2) Single storey extension (32.78m2) to northeast of Blackthorn unit includes alterations of elevations to suit revised layout for Daycare Service. 3) New single-storey external detached M&E plant room to southwest of site (59.98m2). 4) Fit solar panels to roof areas and associated works on all 3 buildings. 5) Alterations of parking/landscaped area to provide ambulance set down area and all associated site development works, services and landscaping. / 0.3 km away / 13 December 2022Granted
- 4697/22The development will consist of a new 208sqm single-storey extension to the south of the existing childcare facility containing additional classrooms and associated service spaces. The building is to be clad in timber with a standing seam metal roof to match existing and to include a glazed canopy over connecting walkway to the existing building. External works are to include an expansion of the existing playground area to the west of the building and additional covered bike parking and car parking spaces to the east with relocated car park exit. The whole site is to be surrounded with a continuation of the existing perimeter fence. All with associated services including roof mounted photovoltaic array. / 0.4 km away / 01 March 2023Granted
- 3303/24RETENTION The development consists of a new 30 sqm single-storey temporary childcare classroom in a stand-alone building positioned in the upper part of the existing carpark. The building is finished in grey painted fibre board cladding with metal fascia to match. External works include an accessible ramp and steps. / 0.4 km away / 25 April 2024Granted