2940/20: PROTECTED STRUCTURE: Planning permission is sought for remedial, repair and recladding works to the copper roofs and domes of St. Francis Xavier's Church, Gardiner Street Upper, Dublin 1, D01 RK07 which is within a conservation area.
St. Francis Xavier's Church, Gardiner Street Upper, Dublin 1, D01 RK07
DecisionGrant permission
Decided21 August 2020
Application typePermission
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dublin City has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- 3033/25PROTECTED STRUCTURE: (RPS. 3138) - The site is located at the junction of Gardiner Street Upper and Sherrard Street Upper, Mountjoy, Dublin 1. The proposed development will consist of the raking out and repointing of the brickwork to the front, rear and side facades of the building, including the three-storey structure to the rear and all chimneys using traditional tuck-pointing detail; cleaning of granite coping, cornice, cills and string course to all facades, cleaning of granite plinth to front railings, cleaning and re-pointing of limestone to rear facades and cleaning of lined plaster render to front and side elevation to the lower ground floor. / 0.0 km away / 19 March 2025Granted
- 3878/24Permission for development at the site at the junction of Gardiner Street Upper and Sherrard Street Upper, Mountjoy, Dublin 1, within part of the garden bounded by a limestone wall, adjacent to St Francis Xavier Church and Presbytery (54-74 Gardiner Street Upper, Dublin 1). and within its curtilage, all Protected Structures (RPS No 3138) The proposed development will consist of the demolition of 2 no. single storey maintenance sheds (combined area 62sq.m.) to facilitate the construction of a two-storey archive storage building at the corner of the walled garden at the junction of Gardiner Street Upper and Sherrard Street Upper, with a new entrance through the existing boundary wall on Gardiner Street Upper. The proposed development, area c. 358 sq.m, will consist of a new entrance gate with associated signage, an open air entrance area with bicycle storage and access to the building; the building itself consists of a reception area, with split level access to the archive storage room, research reading room, ancillary offices, staff facilities, accessible sanitary facilities, platform lift, and plant room and ancillary spaces including a heat pump located in the existing adjoining service yard. Some alteration works are proposed to the limestone boundary wall on Gardiner Street Upper to accommodate an entrance into the building, including the formation of an opening. The development includes the provision of photovoltaic panels at roof level; 3 no. cycle parking spaces; and all associated site development works. / 0.1 km away / 12 August 2024Granted
- 2896/19Permission is sought for works to consist of the following: Change of use of the three properties from office use to residential (other) (807m2), to provide 12 no. 1 bed apartments in 3 no. three storey over raised basement buildings. Internal works: material alterations throughout, including the removal of the single stair from lower ground to ground floor in all properties to create accessible units at lower ground floor, removal of the party wall at first floor return between No. 27 and 28 to provide a communal space for residents; and repairs and services internally to all properties. External Works: remove existing clear corrugated sheet covered pergolas to the rear of No. 26 and 27; replacement of existing uPVC windows with new vertical sliding timber sash windows to the front and rear of No. 28, details to match the existing windows No. 26 and 27; conversion of the window off the main staircase at second floor rear return to a doorway on all properties to provide access to the new roof terraces formed at the return with glazed balustrades, replacing the modern glazed roof structure to No. 26 and 28 and adaption of the existing slate roof to No. 27; conversion of four windows on the rear returns to doorways to provide access to the four new external staircases providing the upper floors with access to the communal garden; adaption of the north face of the rear main roof pitch to allow for a new automatic opening vent (AOV) over the main staircase in all properties; formation of new opes in garden walls at the rear between properties; new accessible ramp to the front of No. 26 and 27 to replace the existing ramp; new accessible external platform lift at the front of No. 28 providing access to the lower ground floor; new hard and soft landscaping proposal; eight new bicycle parking spaces; new enclosed ventilated refuse store; and all associated site services. the proposal will result in residential (other) use throughout No. 26, No. 27 and No. 28 providing accommodation in the form of twelve one-bedroom units, shared communal space and caretakers office. / 0.1 km away / 27 September 2019Granted
- 3478/23PROTECTED STRUCTURE: for the following development: (i) At lower ground floor: removal of non-original partition walls throughout the reinstate original floor plans where possible. Conversion of kitchen at front room lower ground floor to bedroom and erection of stud walls to facilitate new bathrooms to serve 2 no. bedrooms. A new ope will be created in the original wall to provide access to bathroom for front bedroom. Relocation of door to rear bedroom at lower ground floor. Replacement of non-original timber stairs with new timber stairs and placement of W.C. under stair. Relocation of door to plant room by blocking existing ope and creating new external ope. Replacement of non-compliant external concrete stairs with compliant concrete stairs; (ii) at upper ground floor the replacement of dining room door with unopenable traditional four panelled timber door in original style. Installation of kitchen units in dining room to create kitchen/dining room. Removal of non-original arch in hall and installation of 2 no. fire doors. Reconfiguration of non-original partitions to rear extension to provide wheelchair accessible bedroom with kitchenette and bathroom. Non-original floor structure to be replaced above lower ground floor boiler room. Removal of window on rear return; (iii) at first floor, the removal of non-original partition walls throughout to reinstate original floor plans where possible. Relocation of bathroom to rear bedroom and creation of fire lobby. Closing of existing ope into front bedroom and creation of new ope; (iv) at second floor, the reconfiguration of non-original partition walls through to reinstate original floor plans where possible and create fire lobby for front bedroom; (v) at third floor the reconfiguration of non-original partition walls through to reinstate original floor plans where possible and create fire lobby for stairwell. Closing of existing ope into front bedroom and creation of new ope. Removal of non-original timber glazed door and replacement with window at roof level, the replacement of existing roof light over stair with 1 sq.m of glazed automatic opening vents; and installation of 3no. pop-ups at roof level to provide ventilations to WCs below; (vi) replacement of all non-original windows on front facade with traditional sliding timber sash windows and all windows on rear facade with like-for-like; (vii) all non-original internal doors to be replaced by traditional timber panelled doors at hall and flush elsewhere and non-original floor to be replaced by timber flooring where required; (viii) fire upgrade of floors; (ix) installation of upgraded services including electrics, plumbing, fire and burglar alarms, intercoms, CCTV and data/phone points; (x) repair and restoration of original features including window surrounds, painted timber shutter boxes, skirting and plasterwork; (xi) making good of damaged walls, floorboards, fireplaces and plasterwork; (xii) provision of gas boiler and hot water cylinder; (xiii) removal of obsolete fire escape stair to rear; (xiv) repainting of render and cills on front facade and front wall and railings; (xv) removal of cast iron hopper and downpipe; (xvi) replacement of non-original front door repainting of door case; (xvii) all ancillary works necessary to facilitate the development. / 0.1 km away / 13 July 2023Granted
- 2556/20The development will consist of the demolition of No. 10 and No. 11 Belvedere Court and construction of 14 No. 2 bedroom apartments, in one four storey block with a step down to three storey to the rear, (gross area c. 1,106sqm, site area c. 414sqm), arranged around 2 no. external courtyards / lightwells, with balconies to front and rear at ground, first, second and third floor levels, third floor roof level landscaped communal open space to the rear (c. 75sqm), solar roof panels and green roof over four storey block, pedestrian and cycle entrance off Belvedere Court, 18 no covered cycle spaces, associated residential bin storage and all associated site works. / 0.1 km away / 29 January 2021Granted
- 5026/23PROTECTED STRUCTURE Proposed mews development situated to the Rear of No. 13 Gardiner Street Upper (Along Kelly's Row), Dublin 1, D01K6C9 (a Protected Structure registered under RPS No. 3101). The development consists of: The partial demolition of the existing mews building to the rear of No. 13 Gardiner Street Upper to provide for the development of a two-storey apartment building comprising two studio units with 6.4 sqm of private amenity space for Unit No. 1 and Unit No. 2 in the form of balcony/terraces (totalling 12.8sqm), communal open space and 6 no. bicycle parking spaces and bin storage to the rear, 2 no. rooflights, and all associated ancillary drainage and landscaping works necessary to facilitate the development. / 0.1 km away / 22 February 2024Granted
- 2045/19PROTECTED STRUCTURE: Permission is sought to repair and renovate these 2 interconnected buildings (previously granted permission 0379/95). The proposed repair and renovation consist of; - The fitting and enlargement of vertical service ducts to meet utility requirements and to provide improved fire resistance between floors. - Installation of a mechanical ventilation ducting for shower rooms. - The decommissioning of an existing boiler heating system and installing of new heating equipment complete with new flue dilution system on rear elevation of existing boiler room at lower ground floor level and new distribution pipes throughout the buildings to facilitate a centralised heating system. - Upgrading existing electrical wiring, life safety systems and the installation of intercom system for access, phone points and CCTV in common areas.- - Removal and replacement of all kitchen units and sanitary ware with modern fittings. - The removal and amendment of several modern intervention partitions to restore the original character. - The reinstatement of 2 currently sealed door opes in unit 17 and 28. - Works to rear yard of no. 69 to address damp issues in lower ground floor return of no. 1. - Repair work to paving in lightwells facing Upper Gardiner Street and Mountjoy Square. - Other like for like repair work relating to structure including lintels, joist, broken slates, re-felting. For the purpose of compliance with fire regulations; - Closing one door at first floor level Unit 15. - Minor internal layout alterations to 4 apartments to address fire safety issues or to restore original character. - The removal of non-historic concrete block walls beneath stone entrance steps of nos. 69, 1 & 2 and the removal of damaged metal/concrete basement steps in No. 1 Mountjoy Sq. to provide a through route in lightwell to existing basement steps in No.2 Mountjoy Sq. - Installation of glazed doors in light well under entrance steps on No. 69 Gardiner St. and No. 2 Mountjoy Sq. - Hatch into modern existing dropped ceiling to service fire detector in void above common corridor/stair well on ground, first and second floors. / 0.1 km away / 07 March 2019Granted
- 2047/21PROTECTED STRUCTURE: This application site contains 4 no. Protected Structures (RPS Ref. 3095, 3096, 3097 and 3098). The proposed development consists of the following: i. Cleaning and repair of front and rear elevations, railings, plinth and masonry elements. ii. Replacement of windows and rainwater goods. iii. Replacement steel stair leading to external basement area including works to railings to facilitate same. iv. Internal works and repairs including removal of certain existing non original partitions and rendering to basement walls. v. Works to external paving and yard including repair and replacement. vi. Relocation of ground floor kitchen in Nos. 9 and 10 to the basement of Nos. 9 and 10. vii. Provision of external louvre under window at low level in front basement area of No 10. viii. All associated site development works, opes for ducting and conservation works as set out in the application. / 0.1 km away / 23 September 2021Granted