2990/19: Planning permission is sought for a proposed single storey extension to front, side and rear of dwelling incorporating extended sitting room and bedroom, plus all ancillary work.
31, Cherry Orchard Crescent, Dublin 10
DecisionGrant permission
Decided08 July 2019
Application typePermission
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dublin City has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- 3383/24The development will consist of a single storey side extension and all associated site works. / 0.2 km away / 08 May 2024Granted
- 3022/19Permission to construct a 2 storey, three bedroom end of terrace house and new vehicular access to front. This will include service connections and associated works. / 0.3 km away / 11 July 2019Granted
- 4523/22Planning permission is sought for 2 No. of 2 bedroom, 2 storey dwellings attached to side of existing dwelling with new vehicular access points to dwellings and associated site works. / 0.3 km away / 15 November 2022Granted
- 4697/22The development will consist of a new 208sqm single-storey extension to the south of the existing childcare facility containing additional classrooms and associated service spaces. The building is to be clad in timber with a standing seam metal roof to match existing and to include a glazed canopy over connecting walkway to the existing building. External works are to include an expansion of the existing playground area to the west of the building and additional covered bike parking and car parking spaces to the east with relocated car park exit. The whole site is to be surrounded with a continuation of the existing perimeter fence. All with associated services including roof mounted photovoltaic array. / 0.4 km away / 01 March 2023Granted
- 3303/24RETENTION The development consists of a new 30 sqm single-storey temporary childcare classroom in a stand-alone building positioned in the upper part of the existing carpark. The building is finished in grey painted fibre board cladding with metal fascia to match. External works include an accessible ramp and steps. / 0.4 km away / 25 April 2024Granted
- 4886/23Permission for the construction of a two- storey classroom building for additional crèche facilities and all associated site development works to the east elevation at the south corner of St. Ultan's Campus. / 0.4 km away / 11 June 2024Granted
- 4735/23PERMISSION:For the construction of an ASD School Playground area and all associated site development works to the west elevation at south corner of the St. Ultan's Campus, Cherry Orchard Ave, Cherry Orchard, Dublin 10. / 0.4 km away / 03 January 2024Granted
- WEB1336/25The development will consist of the installation of four rapid electric vehicle charging stations and ancillary equipment within the car park of Plaza Park West, Dublin, including one fully accessible EV charging bay. / 0.4 km away / 15 April 2025Granted