3002/23: The proposed development comprises the following: i) Demolition of existing derelict structures comprising 1 no. two-storey and 2 no. single storey former industrial units and removal of existing boundary walls on site c.288 sq.m). ii) Construction of a 9 no. storey mixed use development comprising 40 no. 1 bed apartment units ranging in size from c. 50.3 sq.m - 53 sq.m at 1st to 8th floor level and a community hub (including WC, Kitchenette and office) c. 115 sq.m at ground floor level. iii) All units are intended to provide housing for independent living for older residents (60 years plus). iv) Pedestrian access points to the development from Marrowbone Lane and Summer Street South. v) The development also proposes c.274 sq.m of communal open space as a landscaped terrace at roof level, balconies associated with individual apartment units, ground floor access courtyard (c. 50 sq.m), associated secure bicycle parking and bin storage, ESB Substation, switch room, M&E services room, generator room, hard and soft landscaping and all other associated site works and services above and below ground on an overall site area of c. 505 sq.m.
Corner site (known as Lawlor's Corner), at the junction of Summer Street South and Marrowbone Lane encompassing 72 Marrowbone Lane and 3 Summer Street South, Dublin 8, D08 XV2K
DecisionGrant permission
Decided31 May 2023
Application typePermission
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dublin City has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Corner site (known as Lawlor's Corner), at the junction of Summer Street South and Marrowbone Lane encompassing 72 Marrowbone Lane and 3 Summer Street South, Dublin 8, D08 XV2K?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- 2313/19Planning permission for a 2 storey extension over the existing 3 storey Guinness Enterprise Centre, consisting of 3,735m2 of incubator and co- working space, including the provision of an external stairs and passenger lift and all ancillary site works for the Guinness Enterprise Centre, Taylor's Lane, Dublin 8. / 0.1 km away / 15 April 2019Granted
- 3822/23Planning permission to install 131.2kWp (c.625m2) of Roof Mounted Solar PV Panels and all associated works. / 0.1 km away / 06 October 2023Granted
- 2773/21Planning permission for development at this property consists of a single storey extension to the side of the existing part two storey, part single storey end of terrace dwelling (part of the Thomas Street and Environs ACA); consisting of a study at ground floor level and a roof terrace overhead at first floor level. / 0.2 km away / 29 June 2021Granted
- 2779/20Planning Permission for partial demolition of rear of house and construction of new two storey extension to the rear and construction of new window on first floor to the front. / 0.2 km away / 21 July 2020Granted
- WEB5136/25Permission is sought by Focus Housing Association CLG for development at Nos. 28-34 Braithwaite Street and Nos. 63-66 Pimlico, Dublin 8 (bounded by No. 35 Braithwaite Street to the east and north, Nos. 61 and 62 Pimlico to the north, Braithwaite Street/Poole Street Playground to the west, and by St. Margaret’s Avenue and St. John’s Avenue to the south). The development will consist of the construction of a residential development of 49 no. apartments set over two blocks (connected at ground floor level) ranging from 1-6 storeys in height and consisting of 10 no. studios, 9 no. 1 bed units, 11 no. 2 bed (3-person) units and 19 no. 2 bed (4-person) units, with all apartments provided with private balconies/terraces to north, south, east and west elevations; bin store, plant room, maintenance and store rooms; 1 no. ESB substation; 107 no. bicycle parking spaces (79 no. spaces within bicycle stores at ground floor level and 28 no. spaces within communal courtyard; landscaping including recreational, exercise and play equipment; lighting; boundary treatments; upgrades to existing footpaths with new pedestrian gate to St. Margaret’s Avenue (emergency access/egress only); heat pumps and PV panels at roof level; and all associated engineering and site works necessary to facilitate the development. / 0.2 km away / 06 November 2025Granted
- 3548/20Planning permission for development on a site of 1,764sqm approximately (c.0.18ha) at Nos. 28-34, Braithwaite Street and Nos. 63-66 Pimlico, Dublin 8. The development will consist of the provision of a residential apartment scheme with a gross floor area of c.4,327 in 2no. blocks, each with separate street access via private entrance lobbies from Braithwaite Street and Pimlico, respectively; an overall height of 6 storeys above ground level (with screened and setback rooftop plant) comprising 49no. residential apartments (consisting of 6no. studio apartments, 14no. one-bedroom apartments and 29no. two-bedroom apartments); private amenity space in the form of ground level courtyard terraces and upper level balconies; communal amenity space in the form of a centrally located courtyard and open space area near the southwest corner of the site (482sqm approx. in total) each with dedicated children play areas; and 103 no. cycle parking spaces. The overall development will also include: a new ESB substation; piped infrastructure and ducting; hard and soft landscaping; changes in level; boundary treatments; pedestrian circulation areas and footpaths; drainage works; provision of bio-diverse roofs for assisting with drainage attenuation; communal refuse storage areas; and all associated site development and excavation works above and below ground. / 0.2 km away / 24 March 2021Granted
- 3052/23Permission for removal of existing gable end and rear extensions and the construction of a two storey extension to gable end of house & single storey extension to rear of house also all associated site works. / 0.2 km away / 13 March 2023Granted
- 3362/22RETENTION: Permission is sought for the as built single storey rear extension at 17 Meath Place, The Coombe, Dublin 8. This will require a change in condition number 2 (a) of permission web1242/19 as the builder was unable to maintain the distance from the boundary required by condition 2 (a) in order to comply with condition 4 & 6 of that permission. / 0.2 km away / 29 June 2022Granted