GrantedDecided 08 October 2019Dublin City Council

3053/19: PROTECTED STRUCTURE: The development will consist of the following:- (a) Refurbishment of the Protected Structure building with works to facade onto Parnell Square including repairs and repointing of brickwork, limestone front door surround, minor repairs, refurbishment and painting of ironwork to railings and balconies, doors and windows where necessary. The building will be refurbished internally to provide contemporary office space including installation of modern partitions, alterations to doors and windows; repair and repainting of ceilings and plasterwork. (b) Demolition of non-original mid 20th century 2 storey over basement extension (c. 79m2) and ancillary single storey outbuildings (c. 15m2) and the construction of a new extension (c. 54m2) over 3 floors comprising office space and toilet/kitchen/dining facilities with glazed link to original building on ground, first and second floor. Vehicular access/egress will remain via secure gate from Granby Lane to existing carpark and it is proposed to relocate 1 no. accessible space within existing car park. Permission is also sought for 10 covered bicycle spaces in existing car park, c. 35m2 of pv panel space at roof level and all ancillary and associated site development works.

30, Parnell Square West, Dublin 1
DecisionGrant permission
Decided08 October 2019
Application typePermission
Source documentsPending

Site

What is on file

0refusal reasons0conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Dublin City has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Source documents

Original council portal records and source PDFs where available.

Source link pending

This application was published at source, but the document inventory has not been bound yet.

Nearby precedent

Similar nearby applications linked to this planning decision.