GrantedDecided 11 March 2021Dublin City Council

3156/20: PERMISSION & RETENTION: PROTECTED STRUCTURE: The proposed development comprises the following: (i) Retention permission is sought for the removal of existing non-original partition walls, and the stripping of modern wall, ceiling and floor finishes at basement level; (ii) Permission is sought for internal alterations to the basement to provide five en-suite bedrooms including layout alterations and replacement of existing uPVC windows to the rear elevation (basement level only). The proposed works include the repair of historic fabric including the ground floor structure, the front and back masonry walls, the front windows and the staircase; (iii) The painting grey of the non-original render on the front façade; (iv) Replacement of non-original down pipes on front façade with cast iron pipes in original style; and (v) Drainage and all associated site development and ancillary works necessary to facilitate development.

Hotel St. George, No. 7 Parnell Square East, Dublin 1 (D01E176)
DecisionGrant permission and rete
Decided11 March 2021
Application typePermission
Source documentsPending

Site

What is on file

0refusal reasons0conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Dublin City has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near Hotel St. George, No. 7 Parnell Square East, Dublin 1 (D01E176)?

Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Source link pending

This application was published at source, but the document inventory has not been bound yet.

Nearby precedent

Similar nearby applications linked to this planning decision.
Full reasons for every nearby decision are in the site report →