3157/20: Planning permission for the relocation of the existing single storey security hut with associated bollards and barriers on the east side of the Tolka River crossing on the main access road from Alfie Bryne Road and to the north of Black 1; the erection of four new single storey steel framed and glazed bus shelters at four locations throughout the park and on the main circulation roadway - No 1 between Block L & N and oppossite Block B2; No 2 to the north of Block U; No 3 to the west of Block P3 and oppoite Block R; No 4 to the north of Block P4; along with associaties site works.
East Point Business Park, Alfie Byrne Road, Fairview, Dublin 3
DecisionGrant permission
Decided30 September 2020
Application typePermission
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dublin City has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near East Point Business Park, Alfie Byrne Road, Fairview, Dublin 3?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- 2113/21The development will consist of c.235kWp (c.11.60m2) of roof mounted solar PV panels and all associated works. / 0.2 km away / 25 March 2021Granted
- WEB5557/25CHANGE OF USE: The proposed development will consist of the change of use of the Block U building from office use to medical use (total 1591.5 sq.m GFA) and is described on a level-by-level basis as follows: Ground Floor: 7no. Consulting rooms, 2no. Offices, Entrance Lobby (incl. Waiting area and Reception), Record room, Staff room with Kitchenette, Storeroom, Comm/IT room, 2no. Utility rooms and all ancillary accommodation. First Floor: 3no. Labs, 2no. Offices, 2no. Utility rooms, Waiting area, Teaching/Training room, Support room, 2 no. Stores, Staff Room, and all ancillary accommodation. Second Floor: 3no. Labs, 2no. Offices, 2no. Utility rooms, Waiting area, Teaching/Training room, Support room, Kitchenette, AHU Room, and all ancillary accommodation. The proposed development involves modifications to the internal layout of the Block U building consisting of 3 floors to facilitate this change of use from office space to medical use. To facilitate the proposed change of use at second floor level, a reduction in the size of the skylight on roof of the Block U building is proposed. No alterations are proposed to the external façades of the Block U building. In total 25no. car parking spaces (including 2no. accessible spaces) are proposed to serve the proposed development. The proposed development involves the reconfiguration of existing car parking arrangements for the Block U building to facilitate an increase from 1no. to 2no. accessible spaces and an overall reduction from 28no. to 25no. car parking spaces in total. The proposed development will be served by 2no. existing covered bicycle parking stores together providing a total of 30no. bicycle parking spaces. Planning permission is also sought for the relocation of existing bins to a new bin store and collection area to the rear of the Block U building in the southwest corner of the subject site as well as all ancillary site services and site development works. / 0.2 km away / 18 December 2025Granted
- WEB1473/25The proposed development will consist of the change of use Building P8 from office use to medical use (GFA: 3534 sq.m) and is described on a level-by-level basis as follows: Ground Floor: 3no. Physiotherapy rooms, Office Reception, 3no. Offices, Entrance Lobby (incl. Waiting area and Reception), Staff Room, Storage room, First Aid room, 2no.Staff Showers, Kitchenette, and all ancillary accommodation; First Floor: 7no. Consulting rooms, Treatment room, 2no. Utility rooms, Interview room, 4 no. Stores, 2no. Offices, Staff Kitchen/Lounge, Reception/ Admin room, Breakout space, and all ancillary accommodation; Second Floor: 8no. Consulting rooms, Treatment room, Reception, 4no. Offices, Interview room, 2no. Utility rooms,3no. Stores, Comms/IT room, Hot desking, and all ancillary accommodation; Third Floor: 8no. Consulting rooms, Treatment room, Reception, 5 no. Offices, 2no. Utility rooms, 3no. Stores, Comms/IT room, Staff Kitchen Lounge, and all ancillary accommodation; Fourth Floor: 3no. Research Labs, 6no. Offices, IT Hub, Waiting area, Teaching space/Meeting room, 2no. Utility rooms, Staff Kitchen Lounge, and all ancillary accommodation; Fifth Floor: 3no. Research Labs, 2no. Utility rooms, 4no. Offices, Reception, Store, Waiting area, and all ancillary accommodation; The proposal involves modifications to the internal layout of the Building P8 building consisting of 6 floors, to facilitate this change of use from office space to medical use. Minor alterations to the external façade of the southern elevation of the building are proposed to facilitate the change of use. The proposed development involves the reconfiguration of the existing parking arrangements to facilitate an increase in the number of spaces available from 30no. to 34no. spaces (includes the provision of 2no. accessible parking spaces) and increase in bicycle parking spaces from 48no. to 60no. spaces. Planning permission is also sought for the creation of a pedestrian linkage on the western side of the building for accessibility to the car parking area, installation of new Perspex cover over the existing Bike racks and all ancillary site services and site development works. / 0.2 km away / 01 May 2025Granted
- 2766/21The development will consist of the continued use of a temporary surface car park to provide ancillary parking for ESB staff temporally located at the gateway building, East Wall Road, during the redevelopment of the ESB Networks headquarters offices for a period up to a maximum of five years. The works include minor alterations to the existing internal car park layout reducing overall car parking capacity from 250 to 150 spaces. Permission is also sought to retain all entrances, security gates, security hut, lighting, boundary treatments and all ancillary site works without modification. / 0.3 km away / 08 July 2021Granted
- 4353/22The development will consist of the continuance of use of a 100m long 6.5m wide single lane bridge with access ramps over the M50 and a storage area for imported cars and vans and all associated site development and service works as permitted under planning reg. ref. 2495/17 and reg. ref. 3788/11. / 0.4 km away / 22 May 2023Granted
- WEB2038/24New first floor side extension. / 0.4 km away / 18 October 2024Granted
- 4162/21Permission for change of use of ground floor betting office to a two-bedroom apartment with railings to front delineating entrance. / 0.4 km away / 04 May 2022Granted
- 5051/22Permission for retractable awning above existing outdoor seating area, to front of existing public house. / 0.4 km away / 03 April 2023Granted