3248/25: Development will consist of a proposed new 2 storey detached 3no bedroom house with flat roof dormer to the rear of the new roof making attic level to be used for storage in the side garden of 48 Lein Park. The ridge line of the new house to be 600mm higher than exiting house ridge line. A new vehicular entrance at the front of the new property and all ancillary works.
48 Lein Park, Dublin 5, D05WR44
DecisionGrant permission
Decided31 July 2025
Application typePermission
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dublin City has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- 3215/23RETENTION: Retention planning will consist of a ground & first floor extension to the rear of the existing house and all ancillary works. / 0.0 km away / 31 August 2023Granted
- 5006/22Development will consist of a proposed new 2 storey detached 3 No. bedroom house in the side garden of 48 Lein Park. The ridge line of the new house to be 600mm higher than existing house ridge line. A new vehicular entrance at the front of the new property and all ancillary works. / 0.0 km away / 09 February 2023Granted
- WEB1715/22Construction of a new dormer window to rear of existing dwelling, new porch to front, new windows to side and all associated site works. / 0.1 km away / 26 September 2022Granted
- 2327/19Planning permission for the following: (i) Construction of a new two-storey two bedroom house to the side of No. 7 Mc Auley Avenue, with a new vehicular entrance driveway & pedestrian entrance; (ii) Minor modifications to the existing house to include the demolition of existing side entrance and the construction of a new entrance porch to the front; a new roof light over the stairwell to the rear; and a new pedestrian entrance to the front; (iii) All associated site works, fencing, boundary works, ancillary drainage and landscaping, all at No. 7 Mc Auley Avenue, Artane, Dublin 5. / 0.1 km away / 17 April 2019Granted
- 2318/21The development will consist of: (i) Building a two-bedroom extension above the existing one storey extension at the rear of the dwelling (ii) converting the existing attic storage space to a playroom/study with new dormer window in the rear roof and (iii) new stair access from the upper floor landing including all associated internal, site and drainage works. / 0.1 km away / 26 April 2021Granted
- 2067/19Development will consist of a proposed ground & first floor extension to the side of the existing house extending past the existing rear house line as far as existing ground floor extension and all ancillary works. / 0.1 km away / 12 March 2019Granted
- 4041/20The development will consist of the proposed reconfiguration of existing boundary walls, relocation of existing vehicular entrance and provision of 3 new vehicular entrances. Also, the construction of 3 new dwellings to amalgamated side and rear gardens of existing dwellings consisting of: two new two-storey 2-bedroomed semi-detached dwellings with single storey extensions to front and rear fronting onto McAuley Avenue and one new two-storey 3 bedroomed detached dwelling fronting onto Lein Road. New vehicular entrances, driveways for three off street car spaces, new boundary walls, separation of front and rear gardens and all other ancillary site works included in the application. / 0.2 km away / 31 August 2021Granted
- WEB2137/25Demolish existing single storey extension and construct a two storey extension all to rear, new velux roof window in main roof to front and associated site works. / 0.2 km away / 16 July 2025Granted