Application description published by Dublin City Council.
The proposed development will consist of the construction of a ‘Build to Rent’ residential development comprising of 69 no. apartments (51 no. 1 beds, 18 no. 2 beds) in 2 no. blocks, to be provided as follows: Block A – a four storey building containing a total of 20 no. apartments comprising of 3 no. 1 beds, 17 no. 2 beds with balconies to north, south and east elevations with ancillary residential amenity facilities including concierge and residential lounge at ground level; Block B – a five storey building containing a total of 49 no. apartments comprising of 48 no. 1 beds, 1 no. 2 beds with balconies to south elevations; a single level basement comprising a total of 33 no car parking spaces, 3 no. motorcycle spaces, 148 no. bicycle parking spaces (128 no. spaces at basement level and 20 no. spaces at ground floor level), ancillary plant room and refuse storage areas; along with a play/activity room, gym facility, utility room in support of the Build to Rent ancillary residential amenities and support facilities; vehicular and pedestrian access will be onto Bannow Road. Construction of a basement level social and community centre/non-residential club (Class 10) unit for the relocation of the Cabra Pigeon Racing Club which will maintain its separate access from the eastern boundary of application site providing access onto Bannow Road; The double height retail unit located at 76 Bannow Road will be modified with a new roof structure, extension and modification to front elevation (south), modifications to north east and west elevations, signage and internal floor area and will be integrated into Block A of the development proposal; Landscaping, boundary treatment, drainage, signage, green roofs and solar pv panels to roof level of Blocks A and B, and all associated site and infrastructure works necessary to facilitate the development. The proposed development will also consist of the demolition of the existing two-storey building located at 280 Bannow Road (known as the Alma Hygiene building together with a kickboxing club) the demolition of the existing single storey warehouse unit and racing pigeon club unit at 76G Bannow Road (known as the Dublin Circus Centre and Cabra Racing Pigeon Club Building) and the demolition of all associated structures on site in order to facilitate the development. The subject site is bounded by Bannow Road to the south, ‘The Coach House’ and Hamilton Square to the west, Broombridge LUAS stop and maintenance depot to the north and a gated service laneway which provides separate access to Cabra Racing Pigeon Club’s Clubhouse to the east.
Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.
ABP-309366-21Submitted 10 February 2021 / decided 05 July 2021
Status not recordedREMOVE CONDITIONS
Appeal submittedAppeal reference ABP-309366-21
10 February 2021
Appeal decisionREMOVE CONDITIONS
05 July 2021
No appeal document has been bound to this case yet; the timeline will enrich as indexing continues.
Decision details
Core application dates and identifiers from the public planning record.
Application ref
3308/20
Received
03 September 2020
Decided
08 January 2021
FI requested
Yes
Authority
Dublin City Council
Application type
Permission
Outcome
Grant permission
Source status
Documents indexed. Reason extraction for Dublin City is in progress.
Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.
Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dublin City is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near 76, 76G & 280 Bannow Road, Cabra, Dublin 7?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.
Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.
Source documents
Original council portal records and source PDFs where available.
Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.