3377/24: The development will consist of; 1. Permission for change of use of Centra Off-licence from retail use (85sqm) to Post office use. 2. Associated shop fascia signage.
Centra Off-licence, Unit 3, Shangan Hall, Shangan Road, Ballymun, Dublin 9
DecisionGrant permission
Decided08 May 2024
Application typePermission
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dublin City has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- 3396/24Permission for redevelopment of Centra, Unit 1, Shangan Hall, Shangan Road, Ballymun, Dublin 9. The development will consist of; 1. Permission for change of use from retail use (20 sq.m) to retail with ancillary off-licence use. 2. Increased retail area from 110sq.m to 119sq.m. / 0.0 km away / 09 May 2024Granted
- 4439/19The development will consist of the installation of a new portacabin to facilitate a new classroom for pre-school children, and all other associated site works. / 0.1 km away / 13 January 2020Granted
- WEB1073/25An Saol Foundation (CLG) intend to apply for planning permission on lands at Shangan Road, Ballymun, Dublin 9. The lands are generally bound by Shangan Road to the north, Trinity Comprehensive School to the south and the Gateway Student Village and Shangan Hall to the west. The proposed development will consist of the construction of a 2-storey Neurocare and Rehabilitation Centre, comprising therapy rooms, consultant rooms, activity rooms, sensory rooms, relaxation rooms, activity rooms, meeting rooms, staff rooms/areas, multi-purpose rooms and café with kitchen, offices, dining areas, visitor accommodation areas and rooms, changing areas, stores, plant, water storage, ESB substation at ground floor level; advertisement signage to ground and first floor southern elevations; landscaping (including an internal courtyard and an amenity terrace at first floor level on the south elevation); surface level car parking and bicycle parking; waste storage areas; pv panels at roof level; provision of a new access road on the eastern side of the site that will connect to the Shangan Road to the north and to a new road approved under Reg. Ref. 3926/22 to the south; access will also be from the south western side of the site; boundary treatment; and all associated engineering and site works necessary to facilitate the development. / 0.1 km away / 09 January 2026Granted
- 3649/24The development will consist of: Change of Use of existing Office areas on 1st & 2nd floors to Healthcare Facility use as part of reconfiguration & expansion of existing Healthcare Facility on Ground, 1st & 2nd floors of Ballymun Civic Centre, including internal alterations to enclose existing open plan office areas on 1st & 2nd floors (currently open to the internal atrium) with glazed screen enclosures, and minor alterations to the external façade on Main Street to incorporate ventilation grilles within the existing glazed curtain wall at first floor level. / 0.1 km away / 10 December 2024Granted
- 3551/19RETENTION: the works proposed to be retained are the application of a dashed render finish to the front facade of the house which has been applied over the original brick finish and all associated works. / 0.3 km away / 13 September 2019Granted
- WEB1397/26The development will consist of the provision of 2 no. new ‘Aeropods’, 4.57m x 3.96m each, constructed of recycled aeroplanes for use as a break-out space from the Rediscovery centre and ancillary gardening works. / 0.3 km away / 15 April 2026Granted
- WEB2231/24The development will consist of the placement of an Aeropod (standalone office space made from discontinued commercial jets) to provide an additional office for Rediscovery Centre staff. It will include: a) Locating a single story 5.7m x 3.94 Aeropod (standalone to provide additional office space for the Rediscovery Centre) b) Ancillary works required to meet the required Building Regulation Standards. c) Landscaping and planting to promote biodiversity, in line with Ballymun's Biodiversity Action Plan. / 0.3 km away / 25 November 2024Granted
- 3543/22The development will consist of the change of use from retail (class 1) to gymnasium (class 11), and erection of external signage above the entrance door. / 0.3 km away / 04 August 2022Granted