GrantedDecided 10 December 2019Dublin City Council

3395/19: The proposed development will consist of: (i) the strip-out of existing sixth floor level including exterior walls and glazing, the removal of existing roof finishes and rooflights, and relocation of existing plant enclosure; (ii) the demolition of existing seventh floor level; (iii) the construction of 4 no. additional floors of office accommodation with a rooftop plant enclosure in a new contemporary glazed extension. The development will result in an eleven-storey office building. The proposed works also include internal and external alterations as follows: (a) existing lifts and stair core extended to serve areas to each floor level; (b) existing set-back of the atrium facade on the south elevation will be maintained on the proposed upper floor levels forming a balcony at each floor level from sixth to tenth floors; (c) drainage and all associated site development and ancillary works necessary to facilitate the proposed development.

1, Grand Canal Quay, Dublin 2
DecisionGrant permission
Decided10 December 2019
Application typePermission
Source documentsPending

Site

What is on file

0refusal reasons0conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Dublin City has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Source documents

Original council portal records and source PDFs where available.

Source link pending

This application was published at source, but the document inventory has not been bound yet.

Nearby precedent

Similar nearby applications linked to this planning decision.