3410/23: PERMISSION & RETENTION: For (a) Retention Permission for the existing use of the premises as an 8 bed guest house including the retention of the existing 42m2 single storey extension to the rear of 210 Clonliffe Road., and (b) Planning Permission for some minor internal alterations including the reduction of the number of existing bedrooms from 9 to 8 so as to provide improved bedroom, bathroom and toilet facilities; and also permission to construct a 3.4m2 single storey boiler room attached to the side of the rear return of the building including associated site works.
210, Clonliffe Road, Drumcondra, Dublin 3, D03AW90
DecisionGrant permission and rete
Decided28 July 2023
Application typePermission
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dublin City has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near 210, Clonliffe Road, Drumcondra, Dublin 3, D03AW90?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- 3690/24PROTECTED STRUCTURE. PERMISSION & RETENTION St. Laurence OToole Catholic Social Care CLG, trading as Crosscare, intend to apply for Retention Permission for development consisting of: 1) The change of use from third level education (former Mater Dei Institute) to a family hub providing short term emergency accommodation to homeless families and altered internal layout to provide accommodation units (50 family units/133 bed spaces), 2) Retention of associated works i.e. the provision of new facilities within the existing building including; in the existing 2 Storey block new indoor recreation, play areas and study areas at first floor level, and new family accommodation units, laundry, & gym facilities at ground floor level; while in the three storey central block, new family accommodation units, staff offices and domestic kitchen facilities, together with, in the existing single storey chapel a new quiet room, store, counselling room and staff offices. Externally the replacement of all existing single glazed /panelled units with new double glazing /panelled units. 3) Retention of extensions to the existing two storey western block (former lecture block): consisting of infill modifications and extensions at ground floor level to the existing under-croft to provide family accommodation, i.e. 18m2 at the north end in two small infills, and 102m at the south end consisting of 80m2 of infill & 22m of extension beyond the original under-croft; together with alterations to the existing fenestration on all sides of this block. 4) Retention of extensions to the existing three storey block, to the east an additional 34m2 at ground level to provide family accommodation units and on its new flat roof a new terrace to the existing first floor dining room, including a new external stair to the existing garden area; to the south a new three storey external fire escape stairs; to the west some additional kitchen plant equipment beside the kitchen back door and on the north elevation a new kitchen extract duct up on to the roof. 5) Retention of extensions to the existing single storey block, externally to the south a new 3m2 entrance lobby and internally a new 10m2 first floor counselling room in the existing double height space, resulting in a combined total extension area of 167m2 to the building, bringing the total area of accommodation in the building to 2,532m2 including the extensions. 6) Retention of new free standing external structures, a 9m2 storeroom, a 44m2 covered play area, pedestrian ramps, external children's play area, and associated site development works including two 12m2 metal storage sheds and adjacent bin storage facility and one 15m by 2.4m container as a temporary storage area. The Development Proposed for Planning Permission will consist of 52 new bicycle stands, i.e. 26 open spaces & 26 covered bicycle spaces. The existing car park provides 30 spaces, immediately in front of the building, and the family hub has full access to the existing Clonliffe Road entrance car park with its 46 spaces. All at Crosscare, Clonliffe Family Hub (former Mater Dei Institute), 204-206 Clonliffe Road, Dublin, D03 PD86, which is within the curtilage of the Protected Structure of the former Holy Cross College. / 0.0 km away / 09 July 2024Granted
- 2723/21PROTECTED STRUCTURE: The development consists of: (i) the renovation of an existing end terrace dwelling house, (ii) internal repairs and refurbishment works to the existing building, (iii) reinstatement of main roof, timber sash windows, front entrance door, front steps and railings, and repair to all external elevations of the existing building including the removal of the steel bracing and associated stabilisation works, (iv) the construction of a new 3 storey extension to the rear and, (v) all associated site works. / 0.1 km away / 21 October 2021Granted
- WEB1560/20Permission is sought for the demolition of the existing garage (25sqm), single storey lean-to utility room (6sqm), garden shed, greenhouse and return chimney to the rear, modifications to the ground floor window openings and installation of a velux rooflight to the rear, and associated site works. / 0.1 km away / 07 October 2020Granted
- WEB1664/20The development will consist of the construction of two dormers and roof extension in the attic level to the rear of the property. / 0.1 km away / 27 November 2020Granted
- WEB5143/21The development will consist of the construction of a dormer window in the main roof to the rear of the property. / 0.1 km away / 28 January 2022Granted
- WEB1841/23The development will consist of the construction of a first-floor extension to the rear of the property and the construction of two first-floor windows to the side of the existing return and all associated site works. / 0.1 km away / 24 November 2023Granted
- WEB1485/22The development will consist of the construction of a dormer window in the main roof to the rear of the property, removing a chimney to the rear of the property as well as blocking up one and altering one window, both to the rear of the property. / 0.1 km away / 14 July 2022Granted
- 2610/19RETENTION: planning permission for retention permission for a revised two storey extension to that previously granted under file ref 4013/10 and all associated site works to the rear of existing dwelling. / 0.1 km away / 21 May 2019Granted