3635/23: The development will consist of the erection of new hotel signage which will comprise of the following: 2 no. horizontal lettering signs on front façade (8.28m x 0.625), 1 no. sign over main entrance (3.59m x 0.34m), 2 no. signs on either side of main entrance (0.6m x 0.6m), 1 no. horizontal lettering signage (5.38m x 0.44m) on southern façade (O’Rahilly Parade) and 1 no. horizontal lettering signage (4m x 0.33m) on western façade (Moore Street). All of the above proposed signage will have internal LED illumination.
Jury's Inn, Plaza, Moore Street, Parnell Street, North City, Dublin 1, D01 E0H3
DecisionGrant permission
Decided19 June 2023
Application typePermission
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dublin City has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Jury's Inn, Plaza, Moore Street, Parnell Street, North City, Dublin 1, D01 E0H3?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- 4003/19The development will consist of the installation of an ATM machine to the existing shop front south/west elevation fronting Moore Street. / 0.0 km away / 08 November 2019Granted
- 2863/21PROTECTED STRUCTURE: Permission for a period of 15 years at a site, 'Dublin Central - Site 5' (c. 0.18 Ha) at No. 22 - 25 Moore Street, No. 13 Moore Lane, No. 14 Moore Lane (otherwise known as Nos. 1 - 3 O'Rahilly Parade and Nos. 14 - 15 Moore Lane or Nos. 1 - 8 O'Rahilly Parade and Nos. 14 - 15 Moore Lane), Dublin 1 and otherwise generally bounded by O'Rahilly Parade to the north, by Moore Lane to the east, by No. 21 Moore Street and No. 12 Moore Lane to the south and by Moore Street to the west. The proposed development comprises: - A mixed-use scheme in a single building (c. 6,478 sq. m gross floor area) ranging in height from 2 - 6 storeys (top floor set back) over single storey localised basement. The building includes office space (c. 5,753 sq. m) from 1st to 5th floor with office lobby at ground floor level, with 3no. terraces at 2nd, 3rd and 5th floor respectively (c. 401 sq. m in total) and 3no. licenced restaurant / café units with takeaway / collection facility at ground floor (Unit 1 on Moore Lane, O'Rahilly Parade and the proposed new public plaza - c. 228 sq. m, Unit 2 on the proposed new public plaza - c. 271 sq. m and Unit 3 on Moore Street, O'Rahilly Parade and the proposed new public plaza - c. 179 sq. m), together with provision of a 'delivery hub' unit at ground floor level (c. 46 sq. m). All associated and ancillary site development, demolition, landscaping, site infrastructure and temporary works, including: - Demolition of all existing buildings and structures on site (c. 2,312 sq. m); Provision of part of a new public plaza (168 sq. m) and associated temporary works pending completion of the combined plaza with the concurrent planning application for the adjoining Site 4 immediately to the south (1,253 sq. m public plaza overall); 58no. bicycle parking spaces at ground floor level with associated cycling welfare facilities; Plant at basement and roof level; Building signage zone and retractable canopies; Laying of underground drainage infrastructure from O'Rahilly Parade to connect with existing drainage network on Parnell Street via Moore Street. The application site is outside the O'Connell Street Architectural Conservation Area. An Environmental Impact Assessment Report (EIAR) accompanies this application. / 0.0 km away / 23 June 2022Granted
- 5513/22RETENTION: Retention Permission for a temporary period of 4 years and 11 months, at a site at the rear of Nos. 46-49 O'Connell Street Upper, Dublin 1, situated on Moore Lane for development comprising the continued use of a commercial, off-street car park located over two levels (c. 2,644 sq. m GFA) and associated signage, at the rear of No. 46-49 O'Connell Street Upper, Dublin 1. The car park comprises of 100no. spaces and is accessed / egressed off Moore Lane; at a site of c. 0.14 Ha. / 0.1 km away / 23 February 2023Granted
- WEB5811/25PROTECTED STRUCTURE: The development will consist of full roof, façade and shopfront repair; with the intention of fully weathering the envelope of this protected structure. / 0.1 km away / 30 January 2026Granted
- WEB1860/25PROTECTED STRUCTURE: We Malgil Properties Ltd. intend to apply for Planning permission for development on a site of 0.0215 ha at no.57 Parnell Square West, Dublin 1,D01 FK24 (a Protected Structure Ref. 6416). The proposed development seeks permission for: The commercial change of use from vacant office from basement to third floor levels to a Guesthouse for short-stay tourist / visitor accommodation use, comprising of 13no. bedrooms and associated ancillary development including associated lounge, lobbies, plant area, storage, cleaners/linen area, bike and bin store. Removal of existing non original internal partitions as required. Upgrading of historic doors and floors where required. Modifications to the building's rear external façade including the removal of external modern fire staircase, reinstatement of original window opes and installation of historically accurate sash windows to same. The construction of new internal recessed partitions and doors from basement to third floor levels. Provision of 'pod' en-suite bathrooms for each guest room, and 'high end' fit out. Associated site servicing (foul and surface water drainage and water supply); and all other associated site servicing, landscaping and development works above and below ground. / 0.1 km away / 10 December 2025Granted
- WEB5828/25PROTECTED STRUCTURE: The development will consist of full roof/ valley/ parapet/ rainwater/ chimney repair; access from 11 Moore Lane gantry upgrade and steel door at 1st floor level stairwell review. Front façade works to include removal of redundant services; repair of decayed bay window joinery; localised façade repointing, with the intention of fully weathering the envelope of this protected structure. / 0.1 km away / 30 January 2026Granted
- 3885/24Permission for change of use of vacant 4-storey over basement (Protected Structure) from office use to managed student accommodation to provide 8 no. mix of single, twin and triple bedrooms, 19 no. bed spaces with kitchen, living, dining rooms, study/communal area, sanitary facilities and development of rear yard to provide secure bicycle storage at 56, Parnell Square West, Dublin DO1 K8Y8. / 0.1 km away / 09 June 2025Granted
- WEB2231/25PROTECTED STRUCTURE: The proposed development comprises the adaptive change of use from former hotel to a private members club, with associated repair and conservation works of existing masonry, external and internal joinery, plasterwork and features of significance; including: External works at No.42 O'Connell Street Upper: Temporary access to facilitate works via existing openings through to No.41 O'Connell Street Upper; Permanent repair of the main roof, chimneys, parapets, rooflights and rainwater goods; Front façade structural and brick masonry repair and re-wigging; Rear façade structural repair and replacement of render; and, Perforation of northern gable for opening to connect with the stair/life core. Internal works at No.42 O'Connell Street Upper: Investigative works, including removal of contemporary suspended ceilings at ground floor, removal of non-original, non-load bearing blockwork and partitions, and removal of filled voids at basement; Removal of concrete basement slab; Joinery repair, including main and secondary staircases, wainscotting, fenestration and entrance door; Repair and/or restraint of flat, decorative and vulnerable plasterwork; Cleaning and repair of entrance level flooring; Repair of existing drainage systems where necessary; Removal of sanitaryware and associated pipework at basement level; Provision of new services including heating, lighting, electrical and sanitary facilities; Provision of new fitted bars; and, Application of decorative finishes throughout. Works at the Link Building (located between the existing town house and multi-purpose hall): Careful removal of existing timber roof light truss and sarking boards for reuse within new link building structure; Careful retention of existing basement vault, eastern and southern basement walls; Demolition of remaining link building fabric; Upgrade waterproofing to existing buildings and boundary walls; Minor excavation to the basement to allow for new escape stair; and, Addition of stair/lift core structure to connect the Link with O'Connell Hall. External works at O'Connell Hall: Repair and refurbishment of the roof, all four elevations including the windows. Internal works at O'Connell Hall: Removal of non-original, non-load bearing blockwork and partitions; Removal of concrete slab at ground level; Joinery repair, including staircases, stage structure, wall panelling, floor boards and fenestration; Propping of decorative ceiling and roof light to facilitate repair works; and, Introduction of structural interventions, mechanical and electrical services and fire safety interventions. 41 O'Connell Street Upper: New stair core extension over 5 levels (including basement) connecting to the northern elevation of No. 42 O'Connell Street House projecting into the site at 41 O'Connell Street Upper; Application of temporary mural artwork to the proposed stair core elevations; and, ESB Substation fronting Moore Lane. Moore Lane: Temporary layby/loading bay along Moore Lane to the rear of 42/41 O'Connell Street / O'Connell Hall on the western side of the lane. The application site is within the O'Connell Street Architectural Conservation Area. An Environmental Impact Assessment Report (EIAR) accompanies this application. / 0.1 km away / 25 November 2025Granted