3686/21: Planning permission to erect 1,718.00 m2 or 348.44 kW of photovoltaic panels on the roof of the building in our company with all associated site works.
Unit 3, IDA Industrial Estate, Poppintree, Dublin 11
DecisionGrant permission
Decided14 January 2022
Application typePermission
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dublin City has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- 3119/24RETENTION PERMISSION for erecting 593.20m2 or 123.300 kWp of photovoltaic panels on the roof of our factory with all associated site works. / 0.1 km away / 21 March 2024Granted
- WEB1436/25Planning Permission for the following: (i) Upgrade to existing Effluent Treatment system to include a new Balance Tank, Screen, DAF and Sludge Tank all located within a new detached Effluent and Control Building to the South of the existing Factory, (ii) Single storey extension to the northern elevation of the existing Factory consisting of a Refrigeration Plant Room and Electrical Room and (iii) all associated site works / 0.1 km away / 18 November 2025Granted
- 4472/24RETENTION: Retention permission for a single storey extension to the rear, porch extension to the front and dormer window to the rear. / 0.2 km away / 21 February 2025Granted
- 2538/19The development will consist of: Construction of new two bed detached bungalow total 83sqm, with pitched roof and 4sqm solar panels. All to rear of existing bungalow (No.2), and to be known as 2A Poppintree Cottages with off street parking. Vehicle access is via existing side entrance. All of the above to include new water connection and landscaping with all other services connected to existing. / 0.2 km away / 09 July 2019Granted
- WEB2585/25The development will consist of amendments to Planning Permission Reg. Ref 4457/22 for the construction of a temporary bus depot facilitating the storage, maintenance and dispatch of buses by Dublin Bus, and associated works. The proposed amendments comprise the erection of 4 no. palisade gates (2.4m high) at site entrances and 2 No. palisade fences (2.4m high), and the amendment of condition 13 so that the hours of operation will run from 04:00 to 01:00 each day / 0.2 km away / 28 August 2025Granted
- 4457/22Construction of a temporary bus depot to facilitate the temporary storage, maintenance and dispatch of buses by Dublin Bus. The proposed development is intended to facilitate the temporary relocation of buses from existing Dublin Bus depots (in Dublin City) to allow for phased infrastructure upgrades of those existing depots (including electrification of those depots) and will include: (1) construction of a bus maintenance building to provide enclosed daily maintenance routine of bus vehicles and which shall include; (a) internal night service bay, maintenance / inspection pit, cleaning and washing stations and rim cleaning room, (b) stores, parts, tools, compressor and battery charging rooms, (c) maintenance administration rooms, (d) maintenance staff amenities including; kitchenette with seating, locker, washroom and WC; (2) construction of an administration building including (a) depot control, administration and operation offices; (b) driver staff amenities including kitchenette with seating; locker changing, WC; rest and welfare areas; (c) service plant and store rooms, (3) construction of external, pervious, hard surfaces bus parking for provision of circa 178 buses; (4) construction of vehicle inspection hut; (5) staff and service car-parking and 1 no. staff bicycle shelter; (6) modifications to existing site vehicular entrance/egress points onto Jamestown Road including amended road demarcations; (7) 1 no. back-up generator; (8) 2 no. water storage tanks (for fire hydrant and fire sprinkler systems) and associated pump house; (9) 3 no. bounded fuel tanks; (10) 2 no. security/control cabins situated at site entrance and engress; (11) on-site surface water management including attenuation prior to controlled off-site discharge via hydrocarbon petrol interceptor to existing public surface water mains on Jamestown Road; (12) connection to existing water and foul water mains on Jamestown Road; (13) lighting stands; (14) provision of noise attenuation barrier on western (Jamestown Road) site boundary; (15) signage; (16) landscaping including; erection of new perimeter fencing and planting: (17) all associated site development works / 0.2 km away / 05 September 2022Granted
- WEB2885/25The development will consist of 3no. 3-storey 4-bedroom terraced dwelling houses and 3no. parking spaces that are located to the rear of the proposed development at Hampton Wood Crescent. / 0.3 km away / 08 October 2025Granted
- FW24A/0069Planning permission for the conversion of the existing attic storage to a bedroom with new dormer window to replace existing dormer window to the rear and roof windows to the front along with a single storey extension to the rear with associated ancillary works. / 0.3 km away / 09 April 2024Granted