GrantedDecided 23 January 2024Dublin City Council

3731/23: PROTECTED STRUCTURE: (RPS. 3300) works include the demolition of a single storey, light industrial building, located within stone boundary walls, with the part retention of blockwork wall forming the east boundary of the site. Removal too of a roller shutter, support beam and concrete blocks from the north boundary, stone wall. Construction of a 2 storey, semi-detached, 5 bedroom house, consisting of a single family dwelling, area 152m2, located within the existing boundary walls. Entrance of the house is via an existing entrance ope, in the north boundary wall, from Inchicore Terrace South. Bicycle parking, bin storage and private open space to be provided within the curtilage. Work also include modifications to the east boundary wall, the maintenance, repair and restoration of the protected stone walls, the extension of the existing drainage system with additional SuDs measures and associated site works.

Inchicore Terrace South, Dublin 8, D08 R763
DecisionGrant permission
Decided23 January 2024
Application typePermission
Source documentsPending

Site

What is on file

0refusal reasons0conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Dublin City has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near Inchicore Terrace South, Dublin 8, D08 R763?

Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Source link pending

This application was published at source, but the document inventory has not been bound yet.

Nearby precedent

Similar nearby applications linked to this planning decision.
Full reasons for every nearby decision are in the site report →