4044/19: The development will consist of the following: (a) first floor extension providing en-suite bathroom to rear of existing dwelling, (b) widening of existing first floor window in rear elevation, (c) new roof light to front elevation and all associated site development works.
9, Annadale Avenue, Fairview, Dublin 3
DecisionGrant permission
Decided14 November 2019
Application typePermission
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dublin City has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- WEB1277/22The development will consist of the partial demolition of the return of the existing two-storey end-of-terrace house and the construction of a two-storey extension; a new window on the gable at first floor level, the relocation of the side gate, increasing the height and rendering of the side garden wall and associated hard and soft landscaping and ancillary works. / 0.1 km away / 20 May 2022Granted
- 3976/20Permission for reconstruction of existing attic storeroom with installation of new staircase and dormer window to rear and for 2 no. velux rooflights, one to front and one to rear, with all associated site and drainage works. / 0.1 km away / 19 February 2021Granted
- 3665/24For the removal of the existing rear single storey ground floor and existing first floor toilet and its replacement with a new extension at ground floor [22.51sq.m.] and a single bedroom and toilet at first floor level [10.32sq.m]. The construction of a new 'velux' rooflight and new porch doors at front elevation, internal insulation and retrofitting together with all associated works. / 0.1 km away / 04 July 2024Granted
- WEB1387/25The proposed development will consist of the installation of 18 no. telecommunication antennas, together with 6 no. dishes, 3 no. equipment cabinets and all associated equipment enclosed behind 2no. profiled reinforced, perforated plant screens. the development will provide high speed wireless data and broadband services for all 3 of Irelands mobile operators, namely Eircom (t/a eir), Three Ireland and Vodafone Ireland. The Planning Authority should please note that this is not an amendment application to the original permitted independent living application submitted to Dublin City Council application dated 06.04.2023 reference 5176/22 and subsequent An Bord Pleanála grant dated 02.01.2024 reference ABP-316593-23, which is now under construction. This is a wholly separate and independent application for new telecommunication infrastructure. / 0.1 km away / 19 August 2025Granted
- WEB1585/20Conversion of attic to storage including a dormer window to the rear at roof level. / 0.1 km away / 19 October 2020Granted
- 5176/22PERMISSION: The development proposes the demolition of the existing 2 storey building on site (approx. 1020.5 sq.m GFA), amendments to the quantum of existing car parking, removal of existing substation on Philipsburgh Avenue, and the construction of 48 no. new residential apartment units ( 48 no. 1 bed units) in 2 no. apartment building, consisting of 1 no. 2-4 storey building (Building A fronting Philipsburgh Avenue) and 1 no. 2-4 storey (Building B rear block). Building A provides 22 no. 1 bed apartment units and Building B provides 26 no. 1 bed apartment units. All units are intended to provide housing for independent living for older residents (60 years plus). An office room (7.2 sq.m), communal room (34.2 sq.m) and Kitchenette/WC (10.5 sq.m) associated with the apartment units will be provided. The development also proposes approx. 372.8 sq.m of communal open space, balconies/ terraces associated with individual apartment units, associated secure bicycle parking, car parking (4 no of spaces) and bin storage, ESB Substation, hard and soft landscaping and all other associated site works and services above and below ground on an overall site area of approx 2681 sq.m Access to the development will be via the existing access point along Philipsburg Avenue, which will be upgraded to provide enhanced pedestrian/vehicular access. Access to adjacent pitch and putt club lands is maintained via the provision of vehicular/pedestrian gates in the south east corner of the site. A Natura Impact Statement has been prepared and submitted with this Planning Application. / 0.1 km away / 06 April 2023Granted
- WEB1389/25RETENTION:The development will consist of: Retention of the existing temporary telecommunications structure, for a defined period of 24 months, consisting of a 15m transportable monopole structure secured by 4 anchor bolts to 4 No. 2m x 2m x 1m removable concrete ballast blocks; & all associated antennas, dishes and ancillary ground-based equipment cabinets. Situated within the construction site hoarding on a section of land at 80 - 82 Philipsburgh Avenue, Fairview, Dublin 3, D03H3F1. / 0.1 km away / 17 April 2025Granted
- 2633/20The development will consist of the following: Alterations to and reconfiguration of existing 3-storey mid-terraced pitched roofed apartment building from 6 no. apartments to 3 no. apartments in total including: a) ground floor: reconfiguration of existing 2 no. studio apartments to 1 no. 1-bedroom apartment in total; b) first floor: reconfiguration of existing 1 no. studio apartment and 1 no. 1-bedroom apartment to 1 no. 2-bedroom apartment in total; c) second floor: reconfiguration of existing 1 no. studio apartment and 1 no. 1-bedroom apartment to 1 no. 2-bedroom apartment in total; d) alterations to front (west) elevation and rear (east) elevation to provide new window openings; e) upgrading of internal floors, walls, ceilings and mechanical and electrical installation; f) provision of rear (east) ground floor patio; g) associated site works. / 0.1 km away / 16 July 2020Granted