GrantedDecided 02 October 2024Dublin City Council

4144/24: Permission for development will consist of refurbishment, renovation and retrofitting works to an existing building (Dublin Port Centre and associated ancillary works, comprising: Reglazing and insulation upgrades to all building facades to include installation of louvres (brise soleil type); Revisions at roof level to include replacement of existing roof slab, construction of enclosed viewing gallery (c. 36sq.m) and open-air external accessible deck, reconfiguration of existing plant areas and antennae and provision for plant relocated from fifth floor level, all resulting in a revised total building height (excluding antennae) of c. 36.25m (increased from 34.15m) and a reduction of 39sq.m in gross floor area (GFA) to 60sq.m total; Removal of existing signs (2 no. signs of 9.2sq m each) on the northern and southern façades and provision for 3 no. illuminated corporate signs (combined C. 42.5sq.m) at roof level on the northern, southern and western facades; Internal layout modifications to provide for improved floorplates to include Lower Ground Floor GFA to be reduced by c. 11sq.m to c. 1407sq.m, Ground Floor GFA to be reduced by c. 45sq.m to c. 509sq.m and to include an extended mezzanine over ground floor level of C. 233sq.m (an increase of C. 82sq.m); Increase of GFA at fifth floor level from C. 440sq.m to C. 685sq.m (an increase of C. 245sq.m), facilitated by existing plant removal and relocation. Other associated works to include existing car park layout modifications resulting in a reduction of parking spaces (from 90 no. permitted spaces to 83 no. spaces), installation of electric vehicle charging units at 19 no. existing vehicle parking spaces (of which 2 no. are accessible spaces), provision of photovoltaic (PV) canopies (c. 700sq.m, 4.46m high) over car parking spaces; construction of a new ESB substation (c. 37sq.m, 3m high) and bicycle storage shed (c. 28.5sq.m, 3m high) and all other site works to include site clearance, landscaping, revised utilities and drainage arrangements.

Port Centre, Alexandra Road, Dublin Port, Dublin 1 D01H4C6
DecisionGrant permission
Decided02 October 2024
Application typePermission
Source documentsPending

Site

What is on file

0refusal reasons0conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Dublin City has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near Port Centre, Alexandra Road, Dublin Port, Dublin 1 D01H4C6?

Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Source link pending

This application was published at source, but the document inventory has not been bound yet.

Nearby precedent

Similar nearby applications linked to this planning decision.
Full reasons for every nearby decision are in the site report →