Chief Mechanical Engineers Building, Inchicore Railway Works, Inchicore, Dublin 8, D08 K6Y3
Planning application 4521/23
DecisionGrant permission
Decided22 January 2024
Application typePermission
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Dublin City Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dublin City has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Chief Mechanical Engineers Building, Inchicore Railway Works, Inchicore, Dublin 8, D08 K6Y3?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- 4115/24PROTECTED STRUCTURE: Permission for construction of a Specialist Railway Simulator Training Building to support Driver training for the planned DART expansion Project (DEP). This will be in the form of a Modular Construction 2 storey building within the existing Inchicore Railway Works which has remained in railway operations for almost 180 years. The proposed works to take place at larnród Eireann, Inchicore Works, Dublin 8. D08 K6Y3 The proposed building is within the Curtilage of a protected structure (Dublin City Council Development Plan 2022-2028, RPS No. 8855). / 0.2 km away / 25 September 2024Granted
- 2878/20Planning permission for the construction of new double storey rear extension and all associated works. The works will comprise of new kitchen/family room with utility and WC at ground floor and 2 bedrooms at first floor level as well as internal modifications on both floors. / 0.2 km away / 05 August 2020Granted
- 3770/20The development will consist of the construction of a new 40m2 two-storey Granny Flat to the side of the existing two-storey house with a new interconnecting door, the widening of the existing vehicular entrance to 3.5m. and associated site works. / 0.2 km away / 09 March 2021Granted
- WEB2754/24RETENTION AND PERMISSION:Retention permission for vehicle access to front and planning permission for single storey extension to rear / 0.2 km away / 20 February 2025Granted
- WEB2341/25PERMISSION: First floor extension to rear over existing rear extension with rooflights to existing rear roof slope and with associated site works / 0.3 km away / 31 July 2025Granted
- WEB5112/21A 2 storey to rear extension to provide dining, kitchen at ground level, larger bedroom, bathroom at first floor level. Works include minor internal alterations, modifications to front & rear elevations, 4 roof lights to new extension, 2 velux to existing roof house; 1 front, 1 rear, creation of vehicular access, demolition of existing rear extension & rear sheds & all associated site development works. / 0.3 km away / 20 January 2022Granted
- 2354/21Permission sought for the development to include: 1st storey extension to the rear, new party wall and enclosed storage to the side with all associated site works. / 0.3 km away / 28 April 2021Granted
- 2830/19The development will consist of removal of part railings and hedge to front and the provision of a 3.6m wide vehicular entrance and associated on and off site ancillary development works. / 0.3 km away / 17 June 2019Granted