GrantedDecided 22 January 2020Dublin City Council

At a site located within the south-west corner of the St. James's Gate brewery lands bound by James Street to the south, Watling Street to the east, Steven's Lane to the west and Victoria Quay to the north, Dublin 8

Planning application 4530/19
DecisionGrant permission
Decided22 January 2020
Application typePermission
Source documentsPending

Site

What is on file

0refusal reasons0conditions8nearby records

Proposed development

Application description published by Dublin City Council.
Planning permission for development within the existing Diageo brewery production facility at St. James's Gate, at a site located within the south-west corner of the St. James's Gate brewery lands bound by James Street to the south, Watling Street to the east, Steeven's Lane to the west and Victoria Quay to the north, Dublin 8. The proposed development will consist of: (1) The construction of a forklift building (GFA 236sq.m) (c.14.8m in height), with a return to the north and a metal canopy projecting from a section of the west elevation (+13.647m). The building will comprise of: a work area and gantry; office; breakroom; and storage area. The building will be accessible via: a double height roller shutter door on the west elevation; a single height roller shutter door on the north elevation; and standard pedestrian doors on the west, east and south elevations. Windows will be positioned on the north and west facades. An access ramp will also be installed on the north elevation. A fire escape cage ladder will be located on the southwest corner of the building. The building will have an aluminium clad facade, metal flashing at parapet level and roof lights. A pedestrian barrier will also be erected to the immediate west of the building for safety purposes. (2) The construction of a new canopy structure (GFA 1,070sq.m) (c.8.9m in height) made up of steel columns and trusses and a metal panel deck roof. The canopy will be open on each elevation. The fire escape ladder proposed as part of the forklift building will also connect to the canopy structure at roof level on the north elevation. (3) The construction of an oil containment building (GFA 21.8sq.m) (c.2.9m in height) with a blockwork facade and metal flashing at parapet level. The structure will have a flat roof and will be erected on a concrete plate. The structure will have four sets of welded wire mesh gates on the north elevation. (4) The construction of a hot works unit (GFA 28.7sq.m) (c.4.3m in height) with a metal clad facade and a metal pitched roof. The structure will be erected on a concrete plate. The hot works unit will be accessible via a roller shutter door on the north elevation and a standard pedestrian door on the west elevation. (5) All associated site development works on a site of c.0.24ha. The proposed development is located within a site which has an approved IE (Industrial Emissions) Licence (Ref. No. P0301-04).

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Dublin City is in progress.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near At a site located within the south-west corner of the St. James's Gate brewery lands bound by James Street to the south, Watling Street to the east, Steven's Lane to the west and Victoria Quay to the north, Dublin 8?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.

Source documents

Original council portal records and source PDFs where available.

Source link pending

This application was published at source, but the document inventory has not been bound yet.

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →