GrantedDecided 04 February 2020Dublin City Council

4598/19: PROTECTED STRUCTURE: The proposed development comprises: a) façade alterations at ground level Nos. 30 & 29 Parliament Street with new proposed door to existing shop front, b) change of use from first to fourth floor of the existing north facing stairwell to 4 no. hotel bedrooms (one at each of the floor level),and c) change of use at fifth floor level linen store to hotel bedroom and small internal reconfigurations of linen and cleaner store around the eastern stairwell. The total amount of change of use floor space equates to 68 sqm. The hotel bedroom count will increase from previously approved 117 bedrooms (as permitted with Reg. Ref. 3778/17) to 122 bedrooms over 6 storeys.

Nos. 27-32 Parliament Street (Nos. 27,28 & 31 being Protected Structures) Dublin 2, 1-2 Essex Gate (Both Protected Structures) Dublin 8, and 7-10 Exchange Street Upper (Nos. 9 &10 being Protected Structures) Dublin 8.
DecisionGrant permission
Decided04 February 2020
Application typePermission
Source documentsPending

Site

What is on file

0refusal reasons0conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Dublin City has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near Nos. 27-32 Parliament Street (Nos. 27,28 & 31 being Protected Structures) Dublin 2, 1-2 Essex Gate (Both Protected Structures) Dublin 8, and 7-10 Exchange Street Upper (Nos. 9 &10 being Protected Structures) Dublin 8.?

Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Source link pending

This application was published at source, but the document inventory has not been bound yet.

Nearby precedent

Similar nearby applications linked to this planning decision.
Full reasons for every nearby decision are in the site report →