GrantedDecided 26 January 2023Dublin City Council

27-29, New Row South, Dublin 8

Planning application 4778/22
DecisionGrant permission
Decided26 January 2023
Application typePermission
Source documentsPending

Site

What is on file

0refusal reasons0conditions8nearby records

Proposed development

Application description published by Dublin City Council.
PROTECTED STRUCTURE: Permission for modifications to the mixed use development permitted under Reg. Ref.: 4423/19 & ABP Ref.: 307217-20. The application site is located at the junction of New Row South to the northwest, Blackpitts to the west and Fumbally Lane to the south and southeast. The site contains a protected structure (referred to as a former laundry building under RPS ref 5821). The proposed modifications to the permitted development consist of the following: • Change of use of the 69 no. permitted single occupancy shared accommodation units and amenity spaces from fourth to seventh floor level and extension to permitted 7th floor level to provide 86 no. hotel bedrooms. • Internal alterations to permitted first to third floor level to provide 5 no. additional hotel bedrooms on previously permitted floors. • The proposed development will increase the total number of permitted hotel rooms to 235 no. rooms. • Internal alterations to permitted ground floor level including the removal of residential lounges, gym, restaurant and public community/event space. • The proposed ground floor level comprises co-working, café/restaurant event space, hotel reception, lounges areas and ancillary back of house areas. • Omission of the basement and relocation of plant to an enclosure at 7th floor level. • Provision of 3 no. new window openings to the existing building, a Protected Structure under RPS Ref.: 5821, minor alterations to the previously permitted works to the façade to the Protected Structure including reconfiguration of main entrance points and modifications to the fenestration at first floor level. • The proposed development includes elevational changes to the permitted 8 storey building to the southwest of the site including enclosure of the multi-storey staircase. Provision of a c. 1.4 metre pop- up area at roof level for ventilation purposes and increased parapet height of the building by 300mm to accommodate blue roof system. • Reduction in cycle parking provision at ground floor level. • All associated development.

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.
ABP-315887-23Submitted 23 February 2023 / decided 26 April 2024
Status not recordedGRANT PERMISSION
  1. Appeal submittedAppeal reference ABP-315887-23
    23 February 2023
  2. Appeal decisionGRANT PERMISSION
    26 April 2024
No appeal document has been bound to this case yet; the timeline will enrich as indexing continues.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Dublin City is in progress.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near 27-29, New Row South, Dublin 8?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.

Source documents

Original council portal records and source PDFs where available.

Source link pending

This application was published at source, but the document inventory has not been bound yet.

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →