GrantedDecided 26 October 2022Dublin City Council

4786/22: The development will consist/consists of new branding/advert signs to the south west, south east and north-west elevations including new signage lighting to match existing; new corporate signs with backlit metal and translucent polyurethane letters to replace obsolete existing signs at the 3 existing pedestrian entrances; new freestanding metal glazed canopy (approximately 15.70 sqm) at the Oscar Traynor Road entrance including concealed surface water drainage to be connected to existing system; new freestanding metal glazed canopy (approximately 18.82 sqm) at the Barryscourt Road entrance including concealed surface water drainage to be connected to existing system, partial re-paint of the two existing signage totems with colour scheme matching the existing; removal of the vertical lettering on the east corner of the building.

Northside Shopping Centre, Oscar Traynor Road, Dublin 17
DecisionGrant permission
Decided26 October 2022
Application typePermission
Source documentsPending

Site

What is on file

0refusal reasons0conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Dublin City has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near Northside Shopping Centre, Oscar Traynor Road, Dublin 17?

Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Source link pending

This application was published at source, but the document inventory has not been bound yet.

Nearby precedent

Similar nearby applications linked to this planning decision.
Full reasons for every nearby decision are in the site report →