GrantedDecided 25 February 2020Dublin City Council

4812/19: PROTECTED STRUCTURE: The development will consist of the restoration and refurbishment of the front facade of No. 11 Fitzwilliam Square which is a Protected Structure. The works will consist of the following: 1) Cleaning and re-pointing of the entire facade with lime mortar to include for the replacement of damaged bricks as required, removal of paint from the granite window cills, removal of existing sand cement patent window reveals and re-rendering in lime., 2) Restoration and refurbishment of existing cast/wrought iron balcony at first floor (Piano Nobile) level. 3) Restoration and refurbishment of existing wrought iron railings at street level. 4) Repairs, as required, to front parapet gutter to include the lifting, re-setting on DPC and repointing with lime of existing granite coping stones. 5) Removal of all existing non-original windows (7 No.) and their replacement with new h/w sash windows in a style appropriate to the period. 6) Removal and making good to surrounding brickwork of existing uPVC downpipe on the front facade. 7) General cleaning and repainting of all existing woodwork, door surround, plasterwork etc.

11, Fitzwilliam Square, Dublin 2
DecisionGrant permission
Decided25 February 2020
Application typePermission
Source documentsPending

Site

What is on file

0refusal reasons0conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Dublin City has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Source documents

Original council portal records and source PDFs where available.

Source link pending

This application was published at source, but the document inventory has not been bound yet.

Nearby precedent

Similar nearby applications linked to this planning decision.