5130/22: PERMISSION: Permission for development at a c.0.223 ha site. The development consists of; (i) the demolition of an existing stone clad wall with railing and the removal of 3 no. silver birch trees located adjacent to the Elm Mount Unit Building; (ii) the construction of a single storey over basement Electrical Energy Centre (c. 358.5 sqm) and external stone clad wall to the south-west of the St. Vincent's University Hospital Campus to serve St. Vincent's University Hospital; (iii) provision of a green roof to proposed Electrical Energy Centre, and, (iv) all associted site development works and site services above and below ground required to facilitate the development.
St. Vincent's University Hospital, Elm Park, Dublin 4
DecisionGrant permission
Decided12 December 2022
Application typePermission
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dublin City has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near St. Vincent's University Hospital, Elm Park, Dublin 4?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- 3895/21The proposed development comprises the construction of a new 10 bed Intensive Care Unit (ICU) at the western end of the hospital campus, adjacent to the existing Clinical Services building, on a c.0.2217 ha site; this connectivity is required to link into the existing ICU service and theatres. The proposed works include the construction of a new 3 storey building, to an overall height of 24.163 m ODM. Level 01 will comprise of 10 ICU bedrooms and clinical support accommodation and Level 02 will comprise of office accommodation, staff support spaces and plantroom spaces. These two floors are elevated above Level 00/ ground floor level, which comprises lift shafts, a fire evacuation stair and lobby and structural elements, creating an undercroft space for future expansion of the existing Emergency Department. Works also include a 71 sqm basement at Level -01; this basement will link into the existing Clinical Services building basement for utility services and deliveries. The project includes a connection to the stair of the existing Clinical Services building, to link the existing and new building, and amendments to the facade of the existing building where the proposed new building abuts. The total proposed new building floor area is approx. 2,047 sqm (1,881 sqm internal space & 166 sqm internal plantroom). The screened external spaces comprise of the 830 sqm undercroft expansion area at Level 00 and 20 sqm of external plant at Level 02. The development also comprises of modifications to the existing ambulance access route and arrivals area incorporating a dedicated blue light lane to the west of the proposed building and the re-configuration of the ambulance area to provide 4 no. ambulance parking set-down spaces; hard landscaping, roadways, paths, lighting and signage and all associated site works and diversions are also included. / 0.2 km away / 21 January 2022Granted
- WEB1284/25The proposed development will consist of the construction of a 110 kV / MV electrical substation and will include the following elements: 1. Site clearance works including removal of: i. Existing vegetation; ii. Taxi rank and associated access road. 2. Construction of: i. a substation compound (c. 495 sq.m,); ii. a 110 kV Gas Insulated Switchgear (GIS) building (c. 265 sq.m.; c. 12m in height); that will include a basement (c. 3m deep); iii 2 no. 110 kV transformers, associated bunds and firewalls (c. 7.8 m in height); iv. All other associated and ancillary site development works including the provision of site services; temporary construction compound and drainage. / 0.2 km away / 31 July 2025Granted
- WEB1126/21First floor extension over ground floor level access to side with connection to all services and associated site works / 0.2 km away / 09 April 2021Granted
- 2675/19Permission sought for first floor extension over ground level access to side and combined two storey and ground floor extension to rear removing existing two storey rear annex and also with dormer roof and windows to existing rear roof with connection to all services and associated site works. / 0.2 km away / 06 September 2019Granted
- 2778/20Planning Permission for a temporary period of seven years for development at a c. 0.1065 ha site at St. Vincent's University Hospital, Elm Park, Dublin 4, D04 T6F4. The development consists of the construction of a single storey structure (c. 515 sqm) to the north east of the St. Vincent's University Hospital Campus, adjacent to the St. Rita's building, for a temporary period of 7 no. years to accommodate the relocation of the Human Resources/Medical Administration Department and all associated site development works and site services. / 0.2 km away / 23 July 2020Granted
- WEB2737/24We, Elm Park Golf & Sports Club CLG intend to apply for permission for development at this site: Elm Park Golf & Sports Club CLG, Nutley House, Nutley Lane, Dublin, D04 WE09. The development will consist of: 1) Erection of new safety netting; 2) erection of new flood lighting pole for new driving bays and 3) demolition of old driving bays (exempt from planning). / 0.3 km away / 14 February 2025Granted
- 5366/22The development will consist of: the construction of a single storey bar and restaurant to the south of the existing clubhouse. A covered patio with external seating is proposed to western elevation. / 0.3 km away / 08 May 2023Granted
- 3955/22The development consists of the construction of a single storey building, 51m2 in area and 3 outdoor proprietary roofed swing bays to serve as a swing space / driving range for the existing Elm Park Golf Club at Nutley House, Nutley Lane, Dublin, D04 WE09. / 0.3 km away / 22 August 2022Granted